Are they z purlins? Ie theres already a trough formed for you to lay them in? NYYJ layed in there would be fine by me, they aint ginna fall up! But if its farm or risk of vermin I'd use swa. Use beam clips to support things if you need to traverse any other steels or vertical drops

To add just be aware of grouping
 
Last edited by a moderator:
I see and have put cables in purlins as you describe, but its never the first choice. If the cables are inside the purlin you are only one screw away from cable damage if a roofer or cladder come along. You would be surprised how long the screws used by roofers can be. "Why use a 2 inch screw when i have a couple of hundred 4 inch screws", lol -
If i was planning from scratch i would use my own containment, see it as an investment for the future
 
I see and have put cables in purlins as you describe, but its never the first choice. If the cables are inside the purlin you are only one screw away from cable damage if a roofer or cladder come along. You would be surprised how long the screws used by roofers can be. "Why use a 2 inch screw when i have a couple of hundred 4 inch screws", lol -
If i was planning from scratch i would use my own containment, see it as an investment for the future
Ive only ever done it after a roof is on, and no ceiling is being fitted, ie its all left exposed
 
Ive only ever done it after a roof is on, and no ceiling is being fitted, ie its all left exposed
I am referring to subsequent cladding and roofing upgrades to insulated roofs, i have had it on two buildings where repairs / upgrades have damaged cables (not ones i have installed, i might add... :cool:
 