OP
kung
Hi again GWOD
I still stand by all code 1's have to be rectified or made safe before you leave the place of work ! 1st its the supervisor who done the periodic so his fault although as im sure you know never connect up something unless you know exactly what it is even if isolated as how did you do the dead/live tests ? the problem your going to face is although it was 100% his fault as you changed the CU thus altering the install the periodic will be overuled by your install ! thats what they will say in court as now you cant prove otherwise. was the install energized before you left ?
I still stand by all code 1's have to be rectified or made safe before you leave the place of work ! 1st its the supervisor who done the periodic so his fault although as im sure you know never connect up something unless you know exactly what it is even if isolated as how did you do the dead/live tests ? the problem your going to face is although it was 100% his fault as you changed the CU thus altering the install the periodic will be overuled by your install ! thats what they will say in court as now you cant prove otherwise. was the install energized before you left ?