Is there a reason why the neutral of the 2 ring circuits are in different terminals or am i just seeing things?

Sent from my GT-I9100 using Tapatalk

CPC’s are separated as well. But we can all pick holes in everyone’s work. It’s a neat job but with minor faults. I personally don’t like tri-rated going in to screw terminals.
 
Lol, yes sorry for the photography..


The photo was taken on my old nokia with my arm stretched under floorboards..

It was a nice new peice of t+e for some downlights in the kitchen when my dad decided to put a screw through it..

Pain in the arse..
 
A Few pics of some shed stuff I did. Nice BG Consumer Unit, Weatherproof AND accepts RCBOS :-D I turned up to put the full install in and the customer said, Hello...I'm just gonna paint the shed Lol


100_1317_Before.jpg100_1320_During.jpg100_1326_After_1.jpg100_1327_After_2.jpg
Before
 
Last edited:
few bits i've been dabbling with.

IMG_0463.jpg


IMG_0469.jpg


IMG_0472.jpg


IMG_0471.jpg


IMG_0510.jpg


IMG_0513.jpg


IMG_0517.jpg


and still need to finish

IMG_0519.jpg
 
Last edited by a moderator:
208.JPGThis is what I found today when doing a test on a solar pv install which someone that used to work for the company had done the install but company had no test results, all done from a major player in rewires in Glasgow which I think is shocking terrible terrible practise
 
Last edited by a moderator:
Not sure how to get it uploaded on my iPhone?? Will get photos uploaded onto the laptop tomorrow.
 

OFFICIAL SPONSORS

Back
Top