Hi all, I've been asked to supply a large outbuilding thats to be used as offices via overhead catenary wire. The suspended length is about 50M. Does anyone have experience with this? My plan was to erect a telegraph pole half way and use 25mm 2 core SWA. Would something like split con cable be a better option? is it lighter?

Thanks
 
jumping jack flash ,could it not be put under ground ?or ask the DNO for a new supply to the offices .50mtrs is a long way
considering using 25mm SWA ,for that you would approx. two tel posts .
 
Last edited:
jumping jack flash ,could it not be put under ground ?or ask the DNO for a new supply to the offices .50mtrs is a long way
considering using 25mm SWA ,for that you would approx. two tel posts .
It goes across a tarmac drive way. Could be possible to clip around some walls, trench the lawn then up a telegraph pole then catenary across the drive. .....its a care home.
 
Years ago hard-drawn copper singles were used for such overhead runs. If the overhead section is high enough to be ‘out of reach’ this should still be a viable option if you want to go this way

I’m inclined to suggest HO7-RNF flex or maybe NYY-J for this, I think the weight would be less than SWA.
 
Years ago hard-drawn copper singles were used for such overhead runs. If the overhead section is high enough to be ‘out of reach’ this should still be a viable option if you want to go this way
This ^ Armoured cable would be impractical due to the weight. Split con is quite a good option, it is substantially lighter compared to armoured cable, and depending on distance between supports, you can do away with the messy catenary wire and just use some curly wurlies to attach the cable to the poles/walls.
 
With a 25m span, and the SWA cable mass at 1.625kg/m, you would need to pull it taught at 2500 newtons to make it sag less than 50cm in the middle, i.e. a quarter of a ton!!

If you wanted to keep the sag under 20cm, for example, then you'd need 6250 newtons.
 

Reply to suitable cable for catenary in the Electrical Forum area at ElectriciansForums.net

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Electrical Forum

Welcome to the Electrical Forum at ElectriciansForums.net. The friendliest electrical forum online. General electrical questions and answers can be found in the electrical forum.
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock