I guess it would depend a lot on the details & suppliers. A quick comparison of 2-core SWA in both 25mm and 50mm from Superlec has 660m of 25 coming in at £2,962.08 and 330m of 50 coming in at £2,665.08 so no cost advantage in parallels there. But a whole lot easier to work with!By my rough reckoning parallel cables will be the most cost effective solution, as long as the design is done right.
[automerge]1595440074[/automerge]
The battery & inverter option (a makeshift UPS really) has many attractions but I really doubt about the sanity of battery swapping.Or maybe no long cable run at all and have two battery banks - one at the glamping site and the other being charged at the farm which are swapped over say daily. Especial care would have to be taken with the way the batteries are transported back and forth and connected because of the dangers associated with very high energy density batteries - this would not be a preferred practical way ahead so keep it at the back of your mind for now unless the cable run is very expensive. Nota bene - not a task for glampers to do.
Having some solar PV for "free" electric (good from a green PR point of view) would help, but the main attraction and possible justification is you could run a much thinner cable for mains-charging at all times.
While bad from a power loss point of view, it might make economic sense to allow more than 5% drop at peak demand if the charger is OK with that level of AC variation and safe fault-clearing on the cable can be maintained. That suggestion might kick of a whole thread on its own...
Last edited: