I've done quite a lot of work on UK Highways, none of it soley on lighting, but supplying power to traffic measurement, comms, detection and enforcement, cctv, gantry lighting. This is controlled by cabinets that the company I work for manufacture. Each cabinet is powered from a Electrical Incoming pillar which holds up to 4 fuses. Each fuse has a max rating of 40A. Each cable from here has a max size of 25mm. The cabinet could be 800m+ away from the EI pillar. The cable from the EI is fed to an "A" chamber, upsized if necessary according to the distance needed, this is run in ducting to a chamber local to the gantry or cabinet, then downsized to enter the cabinet , if necessary, where it enters a PDU which is then subdivided into circuits. That long cable is a sub main I believe. I don't see how this method differs from what I've suggested for the stable block. I apologise if I appear stupid, but I'm only translating a method from work, to a domestic situation, to try and make the install easier.
With regards to the parallel question, to provide equal CSA, I went with 2x50's as its the closest coupling to 95 that would ensure equal loading. If I'm barking up the wrong tree, please enlighten me, as I obviously don't have the grasp of it that I thought I had. Thanks!!