LewisM
~
Yes, that is how I found it, directly into the meter, the flats are on a 40A fuse back at the Ryefield board as they have a communal heating system/hot water, reported it to the client who said just fit the SPD we'll get our blokes to sort the Sub main.It goes without saying....... but I'm on about everything being open and unsealed.
It indicates that the isolator has actually been installed, with the outgoing swa having originally been directly from the meter???
Its weird though because the armored goes ~5 meters and has been done like that but the whole flat is wired in steel conduit