Apart from above comments, I would inform the local DNO straight away to get that metal cut out changed ASAP. As flats, are you increasing the overall load of the building?


PS.. Have you checked that you actually do have 3 phases there? Stranger things have happened with those cut outs ie 2 phases and neutral, even though you have 3 x cut outs! Worth checking.
 
I wanna see how that armoured has been made off!

It isn't! I think he says earlier it's just stuffed into the board.
If that's his own work, is he insane posting a picture of it on the internet?!?!
I'd replace it and install it properly before doing anything else.
 
It isn't! I think he says earlier it's just stuffed into the board.
If that's his own work, is he insane posting a picture of it on the internet?!?!
I'd replace it and install it properly before doing anything else.

Must be! Talk about throw yerself into the lions den! And go even further to be snarky to everyone else on here lol!
 
Still not herd from Sajeel then! Things seem to have gone from bad to worst . Is there a way to get his attention so he can answer some of the important question asked ?
 
OP?

tombstone-cartoon.gif
 
Leave him alone lads, it took two days to get it this wrong, it's gonna take at least a week to make it right. He'll be back, if only to boast at how it's all done and sorted.
 
What exactly are you talking about, when you say it was ''Used'' and ''Rattling Inside''??

I think most people here, have been thinking you were talking about a cable when you stated ''Incomer'', but your not are you!!

I was referring to main incomer switch on db
 
Any reason why you didn't perform the full spread of test while you were there? The problem could probably have been bottomed out by now.

I should have done but the flat where head comes is in basement and tenants only gave me access for a short while
 