Apart from above comments, I would inform the local DNO straight away to get that metal cut out changed ASAP. As flats, are you increasing the overall load of the building?
PS.. Have you checked that you actually do have 3 phases there? Stranger things have happened with those cut outs ie 2 phases and neutral, even though you have 3 x cut outs! Worth checking.
PS.. Have you checked that you actually do have 3 phases there? Stranger things have happened with those cut outs ie 2 phases and neutral, even though you have 3 x cut outs! Worth checking.