just wondering are we trying the impossible.installing 2x300mm swa to a eaton 800amp panelboard,because of circumstances the swa enter the building underground in a 1m depth trench,,the dbs are approx 1m above ffl.A 75mm hole will be drilled into the bottom extension box & suitable gland fitted onto armour,we know its gonna be difficult in getting the swa bent then cabling tru hole,any tips? Ideally swa would have been positioned then terminated into panelboard any ideas ?We r starting connecting next week.