Just an aside - I've only ever been involved with UFH once so am by no means expert, but I seem to remember the installation instructions for my example demanding IR tests to be done before the mats are fitted, once they're laid down and again after the floorcovering is installed to keep an eye on the condition of the mats throughout the installaton process. Certainly the one I used provided an area for these results to be noted and suggested it to be left by the CU (apologies can't remember the make). But with this in mind, i'd be concerned about an installation I hadn't been fully involved in