S
Is it possible to power up the elements before the tiles go down, to unequivocally prove that it works, as well as the normal tests, or will it overheat or something by not being buried in the floor as it is designed to be? I'm just thinking of proving to the customer that our stuff works before 'they' go and muck it up.