I do a lot of work for one particular customer who has units all over Scotland, from Hawick to Inverness. I give them the 1st hours travelling for free then just charge my hourly rate after that. I don't take the pee and they seem to trust me.

At the end of the say mate sitting behind the wheel is still working, a bit less skilled but work all the same.
 
I have a customer who happily pays for mileage & travelling time from my door to their job, working time by the hour on their job and then back to my door all by the hour/mile.
It depends on the service and competence you offer.
It is a common business model in many service sectors.
 
Personally i don't charge traveling time. If it's far enough away to warrant thinking about traveling then i build it in to the price.

I've just priced a job that is 80 miles away from where i live, a round trip of 160 miles, so i've built it in to the cost of the work. Now whilst I appreciate that it is entirely possible that a local spark can probably do it cheaper, I have explained my self to the client, and so it is up to him. I can't afford to turn work down, but i certianly can't afford to work for less than i can earn at home, where i can be at home with my family within half an hour of finishing work for the day.

I know the next thing that will come up is "nice if you've got work at home" but what i'm trying to get across is not to sell your self short.
 
My hourly rate is supposed take account of vehicle and accom. job I'm on at the mo is away for 6 weeks with vehicle and fuel included but the next one could be 1 day in Norwich ( some would say that's enough!!) 2 days Cornwall, etc. If you're just pricing for the one job make sure that all of your costs and potential costs are covered. IMO 40p/mile is what HMRC allow you as tax relief for the first 10k miles in a private car so that shouldn't be classed as part of the earn but part of the expense, maybe 50% hourly rate for travel? let us know
 
I have done a lot of subbing for a local contractor. They mainly employ me to test industrial and commercial installations and I charge 40PPM, £9.50 for a motor control circuit, £18 for a light circuit if access can be made from a ground with a small set of steps, £16 for a socket circuit. If there are no previous reports and I need hunting for everything add £2 per circuit.

When I test domestic properties I charge £15 per circuit
 

OFFICIAL SPONSORS

OFFICIAL SPONSORS

Thread statistics

Created
TPES,
Last reply from
ian,
Replies
19
Views
332
Back
Top