Hope somebody can help
I am a time served sparks and a PV installer with all the relevant qualification.
I have installed around 250 PV systems and signed them off as I m NICEIC registered.
The MCS was dealt with through the companies I was installing for.
So here is the question-
As the FIT is so low can you install PV under 3.68 Kw and not apply for the FIT without being MCS accredited.
Thanks in advance
I am a time served sparks and a PV installer with all the relevant qualification.
I have installed around 250 PV systems and signed them off as I m NICEIC registered.
The MCS was dealt with through the companies I was installing for.
So here is the question-
As the FIT is so low can you install PV under 3.68 Kw and not apply for the FIT without being MCS accredited.
Thanks in advance
Remember, PV systems were being installed before MCS