I did a new build with loads of sockets in each room. Metal back boxes. After the boarders and plasterers had been in, second fit and it took a while to dawn why every ring final was open. Mysterious bulges in the plasterboard revealed three "entombed" sockets which they just boarded over.

Had the same back in August, wired 80 downlights downstairs, all clipped and coiled into position (dimensions taken down). Dryliner insulated the ceiling and didnt pull through the cable, i had fun trying to fit my hands in a 74mm hole. According to him i should have followed behind him and pulled them through........Yeah mate Jog ON
Same happened, and I had to get the "lady" of the house-build up my stepladder because she was the only one with small enough hands to turf about above the PB through 73mm openings! 3M high ceilings they were too !
 
Last edited:
Wired a kitchen for a builder last week. Would of been a nice easy job if the new units and worktops weren't already fitted!

Get this one.......went to look at a flat rewire last week that had already been started. Turned out it had already been wired, second fixed, plastered and mist coated........Only problem was none of the cables were in the walls! They were swinging in the wind in front of the newly plastered and mist coated walls, none of the boxes were chased/fixed in to position either o_O
 
They were swinging in the wind in front of the newly plastered and mist coated walls, none of the boxes were chased/fixed in to position either o_O
Wonder how inconvenient it must have been for them to work around the cables? Used to have a saying "wouldn't know if backside was on fire till smoke smelt". Hopefully some more work for Team Lee !
 
yeah I'm going to have to...Its not just that its fitting it in to do it as stacked out and everything is booked in with little room for extras :mad:

This is the problem I have, too much on with extras being added here there and everywhere, chuck in things not going to plan and it becomes chaotic!
 