with them stickers, has the supply fuse been pulled?
 
i've done it before. would not attempt with pilc, but with the concentric, it's no big deal.
 
the feed cable appears to be concentric and would move and bend easily. if i was the spark involved, i'd move the board without hesitation , just gentky bend the service cable as required. ( then again i'm 71, so ain't got thaat much life left anyway. :D:D:D

Thank god sense at last, agree 100%
 
I cannot personally see a problem with moving it, looks like a piece of ---- to me, seriously it is a simple job and a lot of the guys here have just gone bonkers about this, I bet they would do it really lol, I speak as I see
 
I cannot personally see a problem with moving it, looks like a piece of **** to me, seriously it is a simple job and a lot of the guys here have just gone bonkers about this, I bet they would do it really lol, I speak as I see

Course you've got to break those phocidae things afterwards, just to make sure everything's righty tighty.

Praise the Lord.
 
Why not build a wall in front with access for all the electrical bits?? The electrician can work out the thermal de-rating values along with additional rcd protection to affected circuits and cables in wall:rolleyes::rolleyes::rolleyes:
 
The DNO issue those as temporary seals for non DNO workers.
and they have different stickers for meter fitters." Red to Red and Black to Black. If there's Brown and Blue, Consult your Supervisor"
 