It got even better when I popped my head out the back to see a shed supply

20190528_161318.jpg


20190528_161405.jpg


20190528_161335.jpg


20190528_161339.jpg
 
Absolutely standard diy shed hook up.
Seen dozens just like this every year.
The best one most recently was a 10mm g/y used as the ‘washing line’ and 2.5mm red / black singles tied to it using bin bag ties to supply power to a garden work shop. Over a span of about 30metres.
The insulation on the singles was all blistered and crumbly from years of u.v abuse. When I took it down the red and black insulation just crumbled into bits
 
ut was to regulation when installed
When you say this do you mean that because it was ok when installed it is ok now. Eg it passed 16th edition regs and still complying with 16th,, surely then electricians would need to know what was contained within each edition and the time line for each? I don't get this surely all testing is done to the current regs??
 
When you say this do you mean that because it was ok when installed it is ok now. Eg it passed 16th edition regs and still complying with 16th,, surely then electricians would need to know what was contained within each edition and the time line for each? I don't get this surely all testing is done to the current regs??

Yes all testing and inspection is carried out to current regulations. However you only code non-compliances relating to safety, you don't code an item which does not comply but has no effect on the safety of the installation.
For example red and black t&e doesn't comply with current regulations but doesn't affect the safety of the installation.
 
When you say this do you mean that because it was ok when installed it is ok now. Eg it passed 16th edition regs and still complying with 16th,, surely then electricians would need to know what was contained within each edition and the time line for each? I don't get this surely all testing is done to the current regs??
For instance the 18th now states when installing trunking that u need fire clips inside...previously u didnt. Doesn't mean you now have to take it all down and start again. I code it a c3 and mark it down as 5.2 in schedule of inspection where it says cables being correctly supported in their run.
 