That is an interesting point!
Regulation 462.1 requires an installation to a means of isolation, and I would assume that has to be accessible by the owner or occupier of the installed location. Not being able to isolate the supply if an obvious fault is detected (or simply for any repair work) is looking like C2 territory to me.
Ladies and gentlemen, discuss...
Ok what calculations are you thinking of doing? Maybe we can help you check them.
i was under the impression that if it has been calculated previously to 25mm for example (I haven't seen the actual size of tails yet) then the chances are it would need increasing in size
I agree with you if they don't want to move it into the flat then turn it down.
I assume location of consumer unit would be a c3??
How often have you ever seen 35mm2 cable in a domestic property, let alone a 1 bedroom flat?!
What about access to it?Location of the consumer unit wouldn't be any code as far as I am concerned.
Again what annoys me on here is that people don't read all the replies what I said was that the 25mm was an example ffs i haven't done anything yet what I said was IF they were 25mm IF that means they have a reason to be that size and would of been calculated as such so theoretically without actually calculating anything you would initially think cablw size would go up... again not calculated anything yet... and ill say it again I have not calculated anything yet.Why would it need increasing in size? I would say the chances are that it doesn't need increasing in size, in fact I would say there is a very high chance that if you do the calculations correctly the flat would need a smaller supply and cable size th a 25mm.
I did not say that if they don't want to move it I wouldn't do the job. I said that it should be accessible to the flat and if the customer refuses to address this issue I would refuse the job. Giving the flat a key to gain access would be addressing the issue.
Don't assume codes. Location of the consumer unit wouldn't be any code as far as I am concerned.
[automerge]1596144308[/automerge]
Not very often, but that is completely irrelevant. It doesn't matter how many times you have seen a particular cable size in an installation before, that doesn't have any bearing on the calculations.
I specified a 2x 95mm in parallel for a 100A supply not very long ago, I'd never seen that before but it was what I had calculated.
Regardless of the Regs, common sense dictates that there should be a means of isolation in the flat at the very least. Say, if it was midnight on Saturday and the shower catches fire how are the electrics isolated? Put that question to the landlord?
.What if it was the shower switch though?It would obviously make sense to have isolation in the flat, but common sense and electrical regs don't always go together as we know.
In your shower situation, hopefully the shower would have an isolator (as required by regs) - Hopefully that isn't in the cellar too!.
If the property is sold separately to the shop though in the future, the CU might become impossible to access so obviously that is an issue that really should be addressed, though which regulation it would fall under might be an interesting discussion.
Might be more sensible to get the landlord to contact the DNO and see if the service head can be moved into the flat? Though I doubt they'd do that FOC.
Shower catches fire, get out don't worry about isolation. It isn't ideal but I don't see a problem.Regardless of the Regs, common sense dictates that there should be a means of isolation in the flat at the very least. Say, if it was midnight on Saturday and the shower catches fire how are the electrics isolated? Put that question to the landlord?
What if it was the shower switch though?

Does that apply to dwellings.Have a look at the memorandum of guidance on the electricity at work regulations. Regulation 12 requires a means of cutting off the supply. Paragraph 187 of the memorandum requires it to be in a suitable location.
Does that apply to a dwelling.The problem with wiring regulations, etc, is they tend not to be written assuming the most advanced muppetery possible. Same for the EICR codes, they cover what is typically seen but not everything.
As mentioned, here is the HSE guidance:
Pages 33-35 cover this in sufficient detail to allow a C2 code backed up not only by the IET regulations (which are not statutory), but the also by the Electricity at Work Regulations 1989 (which really are "the law").