In case you're not aware, there's a whole Code of Practice that needs to be adhered to when installing an EV charge point. There are many other factors to be considered other than cable size and protective device rating. Also a new circuit and a new consumer unit are both notifiable to building control. And the DNO needs to be notified that a new charge point has been installed. And a whole section, 722, in the wiring regulations is dedicated to EV charge point installation.
If you are aware, please ignore this.