Just had a look at that site, Hmm. Improving the earthing may increase the chances of the main supply tripping when a lamp blows ? ? ? ?

As i said Tony, i do NOT endorse this site as a place to come for advice/help just to curiously take a look at its suggested estimates. I knew i should have made this post annonymous haha

:santa1: incognito posting
 
I must be a very slow worker then, as I always allow a day and a half to do a CU and test.

You allow one day then you're usually still there at 6pm running round like a fool trying to finish off
 
Just found this little gem on the building sheriff site.... its absolute gold.

Whats is an RCD

"The new box will be a “splitter”. This means that certain circuits will now have “super protection”. This means that when little Johnny shoves a nail into a wall socket, the RCD (Residual Current Device - the fancy technology that makes this thing work) in the consumer unit will trip far faster than an old fuse ever did and Johnny will live to get his well deserved good hiding."

:dunce2:
 
I must be a very slow worker then, as I always allow a day and a half to do a CU and test.

You allow one day then you're usually still there at 6pm running round like a fool trying to finish off

Your just slow Dave .....................lol

But yes I have been on a CU change that took a day and half, especially if your extending circuits as I like to do them in an adaptable box with din rail and klippons.

Didn't we have this discussion a while back and a lad posted a couple of hours tops for a CU change?
 
Your just slow Dave .....................lol

But yes I have been on a CU change that took a day and half, especially if your extending circuits as I like to do them in an adaptable box with din rail and klippons.

Didn't we have this discussion a while back and a lad posted a couple of hours tops for a CU change?

The installation is a breeze, its the testing that always seems to take forever
 
stick to ur price mate, as said before if the father inlaw of the so called customer says its too expensive then best he travels down and does it himself........................bloody back seat driver!! sounds like the typical tool u don't need in ur tool bag!! makes me sick, yet she will prob pay £70 an hour to a mechanic to look at her car without battering an eye lid. why do we bother eh! sounds like a job u dont need mate to be honest.
 
stick to ur price mate, as said before if the father inlaw of the so called customer says its too expensive then best he travels down and does it himself........................bloody back seat driver!! sounds like the typical tool u don't need in ur tool bag!! makes me sick, yet she will prob pay £70 an hour to a mechanic to look at her car without battering an eye lid. why do we bother eh! sounds like a job u dont need mate to be honest.

The funny thing is people (women) will generally speaking pay silly money for a huge amount of silly sh*t, £45 for their nails to get done, £20 for spray tans, £10 for FAKE eyelashes...but when it comes to paying reasonable money for an ESSENTIAL part of everyday safety and general survivial, because were all a bit screwed without electricity, people kick up a fuss because they tihnk its their god given right to "haggle" or try and blag down a tradesman.
 
get a fully loaded CU 10way from B&Q for 50 quid all in!!

they great them ones if you get it on bank holiday normally only about £40 - excellent value for money made in china and last for the 12months they designed for.

if you then need to extend the circuits a bit of tape on and bob's your uncle oh and timmy from the pub did it if anyone asks
 
Just found this little gem on the building sheriff site.... its absolute gold.

Whats is an RCD

"The new box will be a “splitter”. This means that certain circuits will now have “super protection”. This means that when little Johnny shoves a nail into a wall socket, the RCD (Residual Current Device - the fancy technology that makes this thing work) in the consumer unit will trip far faster than an old fuse ever did and Johnny will live to get his well deserved good hiding."

:dunce2:

Love it.

a concise clear understanding of current / time graphs there then and how an RCD works .....
 
I have to jump onboard this one too,im doing a cu change tommorrow,had a look last week,nothing labelled,decided to do a PIR first,main bonding needs upgrading(nightmare run)20 mtrs,one thing i found was that the upstairs/downstairs lighting was on one cable,probably a junction box under floor upstairs,now i know that if it goes on 1 CB then it does not conform with the regs as up/down would both go if a fault arised,so unless she wanted me to find the JB and run a new feed to deivide into 2 circuits is it reasonable to put down on the EIC deviation?,I can offer the idea but i cant force it upon them.what do you guys think
 

OFFICIAL SPONSORS

Back
Top