K

Kamikaze

Electrical Definitions
Electrical contractor: A gambler who never gets to shuffle, cut or deal.

Bid Opening: A poker game in which the losing hand wins.

Low Bidder: An electrical contractor who is wondering what the hell he has left out.

Engineer's Estimate: The cost of construction in Heaven.

Project Manager: The conductor of an orchestra in which every musician is in a differend wage bracket.

Critical Path Method: A management technique for losing your shirt under perfect control.

HSE: A protective coating made by half-baking a mixture of fine print, split hairs, red tape and nonsense. Usually applied at random with a shot gun.

Strike: An effort to increase egg production by strangling the chicken.

Delayed Payment: A tourniquet applied at the pockets.

Completion Date: The point at which liquidated damages begin.

Liquidated Damages: A penalty for failing to achieve the impossible.

Can you think of any more?
 
potential difference: the gap between what the job's worth and what the customer wants to pay.

circuit impedance: the resistance of the customer to get his check book out.

trip time: the time it takes a customer to get to the cash point, coz. his last cheque bounced.
 
Bonding: the proess of the boss taking you too one side, and asking a favour.
Testing: the act of trying to keep your cool while bonding.
Snagging: the client trying to find any possible excuse for getting out of paying on time, or paying at all.
 
Certifying: a process to be applied to 75% of customers.

Separation: the art of getting the customer to part with cash/cheque.

Diversity: the difference between cash payers and the " cheque's in the post" brigade.

Segregation: keeping the potential customer away from joe in the pub who will do it for £20
 
Loose screw: An electrician with a technical malfunction.

PME Export: Electricians favourite tipple.

Back EMF: Not 100% sure but it's got something to do with a European Market subsidy.

Step up/down transformer: An electricians favourite dance.
 
Additional protection: Not giving the customer your real name.

Functional testing: A timeless method of verifying the calibration of test equipment using the apprentice.

Erection methods: Usually quick & up against the wall.
 
Last edited by a moderator:
unbalanced load...... a pint in one hand and a double scotch in the other.
 
flashover...... pervert with a microlight
 
containment.... isolating immigrants on the isle of wight and importing seychelles sharks.
 

OFFICIAL SPONSORS

Back
Top