K

Kamikaze

Electrical Definitions
Electrical contractor: A gambler who never gets to shuffle, cut or deal.

Bid Opening: A poker game in which the losing hand wins.

Low Bidder: An electrical contractor who is wondering what the hell he has left out.

Engineer's Estimate: The cost of construction in Heaven.

Project Manager: The conductor of an orchestra in which every musician is in a differend wage bracket.

Critical Path Method: A management technique for losing your shirt under perfect control.

HSE: A protective coating made by half-baking a mixture of fine print, split hairs, red tape and nonsense. Usually applied at random with a shot gun.

Strike: An effort to increase egg production by strangling the chicken.

Delayed Payment: A tourniquet applied at the pockets.

Completion Date: The point at which liquidated damages begin.

Liquidated Damages: A penalty for failing to achieve the impossible.

Can you think of any more?
 
potential difference: the gap between what the job's worth and what the customer wants to pay.

circuit impedance: the resistance of the customer to get his check book out.

trip time: the time it takes a customer to get to the cash point, coz. his last cheque bounced.
 
Bonding: the proess of the boss taking you too one side, and asking a favour.
Testing: the act of trying to keep your cool while bonding.
Snagging: the client trying to find any possible excuse for getting out of paying on time, or paying at all.
 
Certifying: a process to be applied to 75% of customers.

Separation: the art of getting the customer to part with cash/cheque.

Diversity: the difference between cash payers and the " cheque's in the post" brigade.

Segregation: keeping the potential customer away from joe in the pub who will do it for £20
 
Loose screw: An electrician with a technical malfunction.

PME Export: Electricians favourite tipple.

Back EMF: Not 100% sure but it's got something to do with a European Market subsidy.

Step up/down transformer: An electricians favourite dance.
 
Additional protection: Not giving the customer your real name.

Functional testing: A timeless method of verifying the calibration of test equipment using the apprentice.

Erection methods: Usually quick & up against the wall.
 
Last edited by a moderator:
unbalanced load...... a pint in one hand and a double scotch in the other.
 
flashover...... pervert with a microlight
 
containment.... isolating immigrants on the isle of wight and importing seychelles sharks.
 

OFFICIAL SPONSORS

OFFICIAL SPONSORS

Thread statistics

Created
Kamikaze,
Last reply from
Kamikaze,
Replies
66
Views
5,093
Back
Top