I'm not saying that an EICR after the event is as good as an EIC by a competant electrician who's done the install. Just that if you do put your name to one, then you can't be expected to 'take responsibility' for hidden nasties that you couldn't have found by a proper inspection and test. ie, if you do your job properly and document what you've tested and inspected, then you should be able to sleep at night.
 
I'm not saying that an EICR after the event is as good as an EIC by a competant electrician who's done the install. Just that if you do put your name to one, then you can't be expected to 'take responsibility' for hidden nasties that you couldn't have found by a proper inspection and test. ie, if you do your job properly and document what you've tested and inspected, then you should be able to sleep at night.

Agree mate. What I'm saying is that this new "scheme" is just there to legitimise all the DIY electricians who change their own CU at the weekend, then want someone who's spent years of their life training just to come and put a certificate on it for a few quid. It's basically saying that our skills are no better than painting a house, but for insurance purposes let's get someone with a tester to say it's all ok (which they already know because "it works dunnit?"
 
I'm not saying that an EICR after the event is as good as an EIC by a competant electrician who's done the install. Just that if you do put your name to one, then you can't be expected to 'take responsibility' for hidden nasties that you couldn't have found by a proper inspection and test. ie, if you do your job properly and document what you've tested and inspected, then you should be able to sleep at night.


So you walk into a finished kitchen/bathroom extension and sign it off with the builders laffing up their sleeves at you I don't think .

I think everybody is missing the point here they have all but said Part P is unworkable or basically dead in the water and Murdoch why don't they just say it in plain English because there is the catch no Part P no Scheme so you will always need an arbitrator and you are spot it is a farce and has been for the past 3-5 years where they change things for the sake of it making a dependency culture of its members for example

1. BRB changed to BGB plus onsite guide. O will someone sell me a course on this
2. PIR changes to EICR new documentation O will someone sell me a course on how to fill it in
3. New green version of GN3 O will someone sell me a course so that I can understand this
4. 2391 changes to 2392/2393 O will someone sell me a course so that I can understand this
5. 2377 ISI&TEE (PAT) changed to 2/3 new C&G O will someone sell me a course so that I can understand it
6. New 4th edition for ISI&TEE O will someone sell me a course so that I can understand this
7. Changes to Part P O will someone sell me a course so that I can understand this.

So from above the common donominator in all of this is the Schemes and the dependency culture that they have created to milk a trade that they have saturated with Electrical Trainee driving down wages and standards but at the same time ruling over us with a rod of iron. We are the laughing stock of the other trades who watch us fret over interpitting the standards then having to shell out more money for the new Cops or regs I personally have spent £150 this year alone on this
 
Wow oltimer,that sure is one rant
It has to be the best and most comprehensive post I have seen that dissects the part p shambles for what it was
Well done sir
 
Wow oltimer,that sure is one rant
It has to be the best and most comprehensive post I have seen that dissects the part p shambles for what it was
Well done sir

Thanks Des when I served my time I applied myself and took a professional approach to my trade always wanting to excel in what I do and its not my age because I would no tolerate fools or a sloppy attitude someone once said to me you are a different guy out of work I replied no I can differentiate between work and life. I must admit though I have never seen our trade in such a state as it is today plus I refuse now to reply to some posts that the OP is just being lazy,sloppy or downright dangerous
 
Re: Part P changes April 2013 - UPDATED Post #21

This is the next response I got:

"Good morning xxxxx,
In the back of the new version of Approved Document P, the definition of the “registered third party certifier” is as follows:

“A competent person registered with a Part P competent person third party certification scheme”.

However, the issue is that the 3[SUP]rd[/SUP] party certification scheme criteria isn’t likely to be discussed/decided upon until this September.

Regards

Mark Cooper
Technical Desk | ECA Services Division"

I'm sorry to say this but they couldn't organise a pxss up in a brewery.

But on the bright side us legit Part P chaps can do 3rd party testing, using our existing registration so no extra costs! (well, that's how I read it)

Discuss!!

(wonder if Mark is on here! he he)
 
So let me get this right.


For example;


“My mate who isn’t registered with any competent person scheme (there by saving a bundle), installs a new circuit which is notifiable works under Part P of the building regulations. An hour before he starts I get a phone call asking me to test his work when finished, register it with the LABC using my scheme provider registration number, and issue an EICR (which takes a week to fill out!).”


a) Who issues the Electrical Installation Certificate to the customer?
b) Who is now responsible for the installation (myself as the tester)?
c) Will there be another scheme membership to register as a ‘Third-party certifier’ (costing me even more money)!
e) Why do I even need to register with a competent person scheme anymore, when my other mate can now sign off my work (for only a few quid)!
 
So let me get this right.


For example;


“My mate who isn’t registered with any competent person scheme (there by saving a bundle), installs a new circuit which is notifiable works under Part P of the building regulations. An hour before he starts I get a phone call asking me to test his work when finished, register it with the LABC using my scheme provider registration number, and issue an EICR (which takes a week to fill out!).”


a) Who issues the Electrical Installation Certificate to the customer?
b) Who is now responsible for the installation (myself as the tester)?
c) Will there be another scheme membership to register as a ‘Third-party certifier’ (costing me even more money)!
e) Why do I even need to register with a competent person scheme anymore, when my other mate can now sign off my work (for only a few quid)!


You got it!
 
Come to think of it I might tell Niceic to shove it and get someone to sign my work off let them do the paperwork and notification this way I get a receptionist too
 
Honestly you couldn't make this up.

Exactly which idiots "masterminded" the changes to Part Pee?
 
This is a stunning success for Part P.

Builder calls sparky mate in to check electrics, sparky says its OK:

Builder had installed sockets, and underfloor heating.

No certs, nothing notified, client now selling house and Solicitor asking for Certs!!

No Certs.jpg
 