  1. HandsOffEngineer

    Completed Level 1, seeking work experience

    Hello, I've just completed my Level 1 City & Guilds in Electrical Installation (distinction) and I'm looking to gain some work experience before I commence Level 2 in September. If there is anybody here who would be happy to have a 'student' along to observe and assist with labouring, then I...
  2. H

    Completed Level 3 2366

    Hi Everyone I just completed City and guilds 2365 Level 3 qualification. Donot know where to start from site or with some company as a maintance staff. I mean someone with not alot of experience so confused. Thanks and i really appreciate ur help.
  3. B

    Queries regarding Inspection Report I've just had completed

    Hi, My first post so please go gentle on me! I had an Inspection Report (EICR) completed on my house a week a go. It failed on two items: 1) Gap at the back of sockets in the utility (which I knew about, I meant to screw these down, but I only put them up loosely as I knew I had to take them...
  4. A

    EICR rectifications completed by another electrician, what now?

    Hello all. I have recently passed my 2395, allowing me to carry out EICRs and have just thought of a possible scenario for which I'm not sure how I'd handle. I do a lot of work for a letting agency and I know that when they get periodic reports carried out on their properties, if there are any...
  5. D

    Looking for work in poole (have completed 2330 level 3)

    Hi, i'm 24 and have completed my C&G 2330 Level 3 about 6 years ago, am looking to get back into this and would appreciate if you could PM me if you need a hand.
  6. Marcus Vaughan

    Customer completed own repairs after my EICR

    Not a question. Just feeling annoyed and venting. I carried out an EICR on a small domestic property, cleared a few small faults free of charge but gave an Unsatisfactory to Main Earthing and Equipotential Bonding Conductor Sizes. Gave a low quote to put right. He now phoned me up to say he...
  7. S

    Completed level 2 & 3 2365 now need NVQ 3

    Hi All, I've now completed level 2 and 3 2365 as a distance learner. Im now looking for a NVQ level 3 distance/online course, Im from the north east does anyone have any recommendations on a course please Thanks Stephen
  8. D

    Advice needed on my qualifications

    Hi guys, I'm confused and could use some advice, I've look around a lot online and can't seem to find any straight forward answers. So I decided I wanted to be an electrician in school and went to college straight from school in 2010, I completed Level 2 City & Guilds 2330 Electrotechnical...
  9. K

    Newly Qualified

    Hi all, Just completed the C&G 2357 and passed the AM2 last year. This is a second career for myself having completed 23yrs in REME as an Armoured Vehicle mechanic. Been with my current employer 6 yrs, since leaving the Army. Searched this site a lot during my course, found many useful...
  10. MerlinGremlin

    JIB Electrotechnical Certification Scheme (ECS) JIB ECS

    Been looking around at current jobs being advertised and have noticed that the majority of places are asking for Electricians to have there JIB/ECS card but the companies are not JIB and nowhere near paying the JIB rate or offering the associated so called perks, so why are they asking for the...
  11. mikhan

    NVQ2357 and AM2

    Hello Guys, hope you all having fun! i have done 17th ed and c&g 2365 l2,l3 now want to do NVQ 2357 and AM2 where should i go to get them? any suggestion please :
  12. D

    Advice needed for ECS

    Hi all, I have recently applied for my ecs card and have been told that i dont have the certs i'm meant to have. Namely four components of the 236, I only have two, the 'assignments' and 'installation, commissioning, fault diagnosis'. I have my AM2, 2391, NVQ 2 & 3 and I know I never failed an...
  13. ye oldie sparks

    Annual NIC visit this week

    Well the dreaded day came this week with my annual visit, all was going along nicely, paper work in order, meters all calibrated, regs book and other guidance notes in place etc. Then when he asked to see my completed certificates and what installations we are going to see, it all fell apart at...
  14. Christian1981

    Xs training.

    Hi all I just want to recommend Xs training to any of you thinking of doing your nvq. It took me 4 years to complete but that was me being lazy and already being payed sparks rate I couldn't get motivated to start and when I got an email saying it had to be completed by the end of December that...
  15. R

    Hello from Essex

    Hello everyone, I have been lurking the forum for some time, plucking knowledge when needed. I completed an all in one buddle course back in 2012, this was 6 week testing, 17th edition, part p and lvl2 2392 testing. I then begun working on site, where I have now completed my NVQ 3 2356. I...
  16. J

    Domestic Got Problems at work any advice ??

    Hi there, I am an apprentice and i have worked for my boss for about 18 months now and I feel as that I know a good amount of electrical knowledge and i am still on £2.68 an hour. I have already completed a C&G 2330 LV2 and I have been on a 2357 C&G LV3 With the NVQ LV3. I have done my 1st...
  17. D

    training required

    hi all I am new to this board so be with me... I m trying to get into the industry through OLCI training and ive completed level 3 and level 4 of the 2330/2357 (it keeps changing!) and have passed my 17thedition wire regs the final part need to complete is the NVQ whereby you need more on site...
  18. F

    Legal rights to materials when customers don't pay?

    I hope someone can help. I've taken on a large project, new build oak frame house. Customer happy to pay deposit and then money at completion of first fix. Completion of second fix has been delayed as they've run out of money to complete parts of the building but a large part of the second...
  19. R

    Please suggest good C&G courses that is worth considering to improve knowledge

    Guys, I'm looking to leave BT after 9 years. I completed a 3 year apprenticeship before moving in to the planning office to perform the role of electrical designer, and as result I have limited practical experience. Please suggest what courses will benefit me to improve my employability when...
  20. D

    JIB Electrotechnical Certification Scheme (ECS) Help with JIB card/2330

    Hi Guys. First ever post on a forum so bare with me... Basically I am looking at applying for my JIB card. I have my 17th edition NVQ 2356 and 2330 level 2. Only problem is I never finished my 2330 level 3. I did the level 2 fine and the 301 and 302 of the level 3 but never completed. Can I...
  21. D

    JIB Electrotechnical Certification Scheme (ECS) Jib card

    Hi i completed the 2330 levels 2 and 3 a couple of years ago to the 17th edition and sent off for my jib card which came back with trainee on it. I have since completed the nvq 3 and want to renew my jib card,but do i need to do the 2382 17th edition exam for them to grade me as a an...
  22. N6rul

    jobs signed of by third party

    Ok guys have a question. I have registered with NICEIC. As you guys are aware they need 5 jobs to be assessed. Now my problem is all the jobs I have done have been signed off by a third party. Now can I still show them as my jobs and re do the tests myself and certify again.??? Thanks
  23. K

    2330 & AM2...Whats next

    Hi All I have recently completed my 2330 and my AM2 and I am wondering if i need to do the full 3 day 17th edition course or can I do a one day course or just the exam?? Any help or advice in this matter would be wonderful as cannot seem to get a straight answer from any training body. They...
  24. G

    sooo EPC's for part completed new builds with provisional SAP assessments?

    Appologies if Ofgem have answered this in their guidance and I've missed it, but we've got an installation coming up on a new build very low energy house (not quite passif house standard, but not far off). Anyway, we're going to be doing the solar PV installation significantly before the house...
  25. J

    niceic assesment passed!

    just passed my niceic assesment to be a QS for my company-we mainly do commercial works. those of you who may have any questions about whats involved pls feel free to ask - it wasnt half as bad as i thought it would be.
  26. W

    underpinning knowledge

    hey guys i realise its a big ask but im struggling with my jtl underpinning knowledge questions and its '**** or bust' time now, ive completed the first 3 sections and part completed sections 013,014,015,011 and 002. if anyone could send me any help at all it would be a huge help and probably...
  27. S

    Confused.com

    hello one and all, new to the site and I am looking for some hel[p and advice, but first let me start with a long winded story. recently my company that i work for lost the long term contract which I was working on, and under the Tupe laws i was due to go over to the new company. However one of...
  28. G

    JIB Electrotechnical Certification Scheme (ECS) Why arent my Qualifications on back of JIB Card

    I have just recently sent off and received my first graded JIB card. i am now classed as an installation electrician. My problem is on the back of the card it lists my qualifications as: NVQ 3 and 17th Edition I have also achieved my AM2 and C & G 2330 Level 2,3 plus other add on courses, but...
  29. T

    JIB Electrotechnical Certification Scheme (ECS) JIB & alternatives

    Hi, I posted a question a few days ago about problems in getting a JIB card .. I've got all the quals including NVQ 3 and a completed apprenticeship - but my employer won't give me a reference and JIB won't issue a card without the reference - I have confirmed this with JIB !! My next...
  30. S

    can i certify my work??

    i have completed my C&G 2330 level 2&3, and have also completed part-p. i normally work in commercial environments but have been asked to do some work in a house, if i re-wire this house would i be able to test and certificate it? thanks,
  31. E

    periodic testing

    Hi i have recently done a periodic test on a nursey and had to fail it on several points, i have gone back and completed remedial work and issued certs for remedial work. Can i now just reissue a periodic cert with a satisfactory pass as they need a PIR for the insurance,,
  32. M

    JIB Electrotechnical Certification Scheme (ECS) Likely JIB grade?

    Hi, I'm hoping someone could give me an idea of what JIB grade I'm likely to be? So far I've completed: - 2330 L2 - AM2 - NVQ (studying 2330 L3) - Have one years experience as mate. Any help will be much appreciated! Cheers, Mark
  33. R

    Paper Work

    In the process of gathering paper work for my assesment. I was wonering what paper work you guys keep and what you show to the assor when being assessed anually. As i understand i need the following. IEE 17th Book IEE 17th On-site Guide EWR 1989 Memorandom (blue book) H&S At work act saftey...