I have a question regarding the Feed-in tariff:
We have looked at a potential project in an industrial estate on a total of five roofs with an overall capacity of 124 kWp.
If the project is treated as one installation, the FiT would be 29.3 p.
If each roof gets its own meter, is it possible...