you don't bond trunking, you earth it as it is an exposed metal part and may or may not form part or all of the cps/s for the circuit/s within. tray normally carries sheathe cables and as such would only need bonding if it were extraneous.
 
I underatand that the containment systems are already in place but, surely that means I can still bond it to the MET etc. Surely I wont just leave it?
There is no requirement on the AM2 to carry out any bonding of the pre-installed containment/tray etc. Unless the assessor syas otherwise, don't bond it.
 
you don't bond trunking, you earth it as it is an exposed metal part and may or may not form part or all of the cps/s for the circuit/s within. tray normally carries sheathe cables and as such would only need bonding if it were extraneous.[/QUO

I don’t agree with the last part.

EMC and ATEX requirements say otherwise.
 
Last edited:
When it comes to the am2 do exactly as you are told to do, nothing more nothing less. Don't over complicate anything and you'll be fine. They won't look for anything other than what you have been told to do.
 