Jan 26, 2022
3
0
31
England
If you're a qualified, trainee, or retired electrician - Which country is it that your work will be / is / was aimed at?
United Kingdom
What type of forum member are you?
Trainee Electrician
In the am2s assessment where do I write the Continuity Of Protective Conductors test results? Where on the test sheet do I add the results?
 
What tests do you carry out to ensure they are continuous?
 
  • Like
Reactions: DPG
Upvote 0
What tests do you carry out to ensure they are continuous?
A continuity test by disconnecting both ends and testing end to end to get a resistance. I’m not sure if I need to add this to the test sheet as a circuit or just tick a box on the schedule of results it’s for my am2s end point assessment
 
Upvote 0
A continuity test by disconnecting both ends and testing end to end to get a resistance. I’m not sure if I need to add this to the test sheet as a circuit or just tick a box on the schedule of results it’s for my am2s end point assessment

When we link out certain conductors, or use a wander lead to test continuity, what are these tests normally known as?😉

It’s all ready on the schedule of test results.
 
  • Like
Reactions: SparkyChick
Upvote 0
@mpratt263801 ,

The point we're both making is this, there are two tests you can use to establish whether or not the CPC is continuous. These are commonly referred to using the results they provide, which is the R1+R2 test (typically performed by linking L+CPC at the board and then taking a resistance reading at each point on the circuit and recording the highest value - Ring finals is different and you get the R1+R2 during the figure 8 testing) and the R2 test (typically performed by connecting a wander lead to the earth bar in the board and then going to every point on a circuit and taking a resistance reading to the CPC connection and recording the highest value).

The results from these tests have their own result columns on the schedule of test results.

But I'm also thinking this could be the same confusion I recall... I'm honestly not sure of the source of this question, I think it was my AM2, but I'm not 100% certain... I recall being asked a question along the lines of 'What are the results of the CPC continuity tests?' and there just being like a blank space... no table, just a place to write. The answer I gave went something along the lines of 'The CPC of all circuits is continuous as demonstrated by the R1+R2 results obtained for them on the schedule of test results (there are no open circuits and the results appear to be in the expected range)' or something like that. I also remember being somewhat confused about what they were expecting.
 
  • Like
Reactions: DPG and JBW175
Upvote 0

Similar threads

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electric Underfloor Heating Electrician Courses Heating 2 Go Electrician Workwear Supplier
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

Advert

Daily, weekly or monthly email

Thread starter

Joined
Location
England
If you're a qualified, trainee, or retired electrician - Which country is it that your work will be / is / was aimed at?
United Kingdom
What type of forum member are you?
Trainee Electrician

Thread Information

Title
Am2s Continuity Of Protective Conductors
Prefix
N/A
Forum
Electrician Courses : Electrical Quals
Start date
Last reply date
Replies
4
Unsolved
--

Advert

Thread statistics

Created
mpratt263801,
Last reply from
SparkyChick,
Replies
4
Views
2,229