Discuss Another housebashing question in the UK Electrical Forum area at ElectriciansForums.net
So do I. However I discovered that a pack of bamboo skewers is really really useful - especially when working on old lime walls where you mostly can't get the hole to drill cleanly enough to tack a plastic plug. Saves all that whittling.Still use wood as plugs sometimes myself even now tel
McDonald's coffee stirers, always pick up a handful when in there.So do I. However I discovered that a pack of bamboo skewers is really really useful - especially when working on old lime walls where you mostly can't get the hole to drill cleanly enough to tack a plastic plug. Saves all that whittling.
Always carry cocktail sticks on me van for rehanging old doorsSo do I. However I discovered that a pack of bamboo skewers is really really useful - especially when working on old lime walls where you mostly can't get the hole to drill cleanly enough to tack a plastic plug. Saves all that whittling.
"Chop Saw and Nail Gun" lightweight
You've been lucky then Ian1981Joiner’s fit lighting boards and noggins for all lighting and boxes.
Never been on a site when they don’t.
The major house builders have always had to do this Pete on the sites the company have had.You've been lucky then Ian1981
I can believe it Mate how times and practices change!!!The major house builders have always had to do this Pete on the sites the company have had.
The only building work we carry out are core cuts for fans and drilling holes in the joists
I’m on a school refurb where the builder’s price includes all chases, drilling out, core cuts and noggins, we just wire and install, cable basket/trunking etc.I can believe it Mate how times and practices change!!!
On the larger sites we used builder's labour to do the chases. problem was he was Deaf and dumb, so instructions were difficult to relay. We didn't know his name other than he was Polish, nice bloke we called him Deafy, for no other reason than not knowing his real name.I’m on a school refurb where the builder’s price includes all chases, drilling out, core cuts and noggins, we just wire and install, cable basket/trunking etc.
Draw back is it’s labourers doing chases and they are useless.
We have a guy called Costy, he gets called Costa coffee instead of his matesOn the larger sites we used builder's labour to do the chases. problem was he was Deaf and dumb, so instructions were difficult to relay. We didn't know his name other than he was Polish, nice bloke we called him Deafy, for no other reason than not knowing his real name.
Reply to Another housebashing question in the UK Electrical Forum area at ElectriciansForums.net
We get it, advertisements are annoying!
Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.