I am about to quote for a fairly large area of electric underfloor heating.

It will involve fitting loose cable into the decoupling membrane. The membrane will already be done. I will just be clipping in the heating cable. Along with this I will install the floor stat, room WiFi stat and FCU. This will be a new supply, a fairly easy route from CU to FCU.

It is not a perfect rectangle, there will be quite a few 'different shapes' to make.

The area will be approx 20 Sqm.

Ignoring all material costs, I was thinking I would quote assuming it would take a day. Does this sound about right?

Cheers!
 
Used to sell UFH and install it. Usually charge about the same as the UFH costed per square meter. So should find you get more than a days rate for it. Mind, that was then covering it all with a self-levelling compound too. Which is dead easy. Cost of SLC is on top. Some aren't suitable for no traffic, so need tiling to. Some suitable for laminate, etc. But worth finishing the floor fully as someone could cock it up after it's left installed in the insulation but not then encased in a compound to protect it.

My first actual helpful post on here I think this. Keep this up I'll have done 3 come 2065.
 
Used to sell UFH and install it. Usually charge about the same as the UFH costed per square meter. So should find you get more than a days rate for it. Mind, that was then covering it all with a self-levelling compound too. Which is dead easy. Cost of SLC is on top. Some aren't suitable for no traffic, so need tiling to. Some suitable for laminate, etc. But worth finishing the floor fully as someone could cock it up after it's left installed in the insulation but not then encased in a compound to protect it.

My first actual helpful post on here I think this. Keep this up I'll have done 3 come 2065.
I must admit, I was a bit surprised to get electrical advice from you 😄, but its well received.
 
I'd even wire it to the stat and that to a switched fused spur which would have been fed from its own RCD in the MCB by an actual spark before we arrived.

Check that out. Think I was right?

P.s. www.uheat.co.uk give good discounts to forum members. And supply the blue boards which are super easy to stick down with a flexible adhesive. Some can have installation traffic (using a plank to spread your weight) to lay the wire within hours after laying. So can all be done in a long day and can make some good money.

For future reference.
 