Can someone answer this for me plz.
Do I need to bond to the gas metre where the pipe is completely on the outside of the house except where it enter through the brick work into the boiler?
Someone said no because its doesn't count as an extraneous conductive part.
Also the same house has a plastic incoming supply to water, brass stop cock then plastic pipe up to the boiler where it meets the water pipes for the whole house which are copper throughout.
For both gas and water I was told to disconnect any parallel earth paths and take a reading between the met and the gas pipe as it enters the house at the boiler. Same test between the met and the t'd off water pipes.
Something about gutting over 22k ohms and its okay to not bond? I was told an r2 for both the above. Got open circuit all round which I expected can Someone clear this up please.
Seems to be a grey area as I have asked around already.
Cheers
Do I need to bond to the gas metre where the pipe is completely on the outside of the house except where it enter through the brick work into the boiler?
Someone said no because its doesn't count as an extraneous conductive part.
Also the same house has a plastic incoming supply to water, brass stop cock then plastic pipe up to the boiler where it meets the water pipes for the whole house which are copper throughout.
For both gas and water I was told to disconnect any parallel earth paths and take a reading between the met and the gas pipe as it enters the house at the boiler. Same test between the met and the t'd off water pipes.
Something about gutting over 22k ohms and its okay to not bond? I was told an r2 for both the above. Got open circuit all round which I expected can Someone clear this up please.
Seems to be a grey area as I have asked around already.
Cheers