- Reaction score
- 58
Good morning all!
Currently carrying out an EICR on a commercial property and have noticed 8 lighting circuits bunched into 2 MCB’s.
0-EE74-FE0-F729-4048-A7-F4-2979-EBDFD688 - https://ibb.co/hCTKpsC
No real danger but not very practical as nuisance tripping could occur and the labelling is a bit vague on the CU.
I’m thinking C3 with recommended CU upgrade.
Any thoughts?
Mike
Currently carrying out an EICR on a commercial property and have noticed 8 lighting circuits bunched into 2 MCB’s.
0-EE74-FE0-F729-4048-A7-F4-2979-EBDFD688 - https://ibb.co/hCTKpsC
No real danger but not very practical as nuisance tripping could occur and the labelling is a bit vague on the CU.
I’m thinking C3 with recommended CU upgrade.
Any thoughts?
Mike