Mick - draw your neck in, your attitude strongly reminds me of those I sat my 17th with, all brass and cocky...the amount of excuses uttered when they failed was unreal, along with childish whinging about why its pointless to change this or that etc...
I stand by the standard of my work.....unlike the 3 time served approved, gold card holding and JIB graded sparks who've worked on my dads place...utter mess of wiring, long inner cores left exposed on top of kitchen units, polarity reversed in several areas and thats just the start, I hate to think what lurks under the floors........
Oh and BTW.....I could quite easily get engineer status with the IET, If I fancied spending the membership fee.....I'm more than qualified to do so...
I know your kind....keyboard warrior who likes to dish out the abuse to other people, knowing full well the chances of having to "face the music" are slim to nil.....
I also seriously doubt any DIYer is going to be running 3 phase on tray, nor as archy says what 2.4mV/A/m means.