Mick - draw your neck in, your attitude strongly reminds me of those I sat my 17th with, all brass and cocky...the amount of excuses uttered when they failed was unreal, along with childish whinging about why its pointless to change this or that etc...
I stand by the standard of my work.....unlike the 3 time served approved, gold card holding and JIB graded sparks who've worked on my dads place...utter mess of wiring, long inner cores left exposed on top of kitchen units, polarity reversed in several areas and thats just the start, I hate to think what lurks under the floors........

Oh and BTW.....I could quite easily get engineer status with the IET, If I fancied spending the membership fee.....I'm more than qualified to do so...

I know your kind....keyboard warrior who likes to dish out the abuse to other people, knowing full well the chances of having to "face the music" are slim to nil.....

I also seriously doubt any DIYer is going to be running 3 phase on tray, nor as archy says what 2.4mV/A/m means.
 
Why separate earth? the armour would probably suffice, but you may want to look it up. If you search on here you'll find tables that will help.

The SWA will indeed more than suffice as the CPC. It won't however be suitable, if main bonding is to be carried out from the DB's EMT that this cable is supplying!! It will then need a suitably sized separate earth conductor....
 
Mick its people like you that can make work a living hell, your some sort of sarcastic smart **** .
All this op wanted was confirmation and clarity but you have to give it all the big man sat behind your laptop at home...... people like you should be banned from the site as people get nervous posting there queries incase a **** like you pipes up!!!!!!!
The op probably has more electrical knowledge than you anyway!!!!
 
Hi E54 (post 19) could you explain a little more please. For the less experienced.

Thanks
 

OFFICIAL SPONSORS

Back
Top