G
Griffin
Hi All,
I have a rewire on an ancient farmhouse, the builder suggested running cabling on top of concrete sub floor in trunking.
On top of the concrete there will be 70mm celetex insulation and the electrical trunking will be installed within this layer.
The wet WFH system will be laid on top of this.
Anyone ever done this before???? Obviously thermal effects of the heating will need to be considered etc
Thanks in advance
G
I have a rewire on an ancient farmhouse, the builder suggested running cabling on top of concrete sub floor in trunking.
On top of the concrete there will be 70mm celetex insulation and the electrical trunking will be installed within this layer.
The wet WFH system will be laid on top of this.
Anyone ever done this before???? Obviously thermal effects of the heating will need to be considered etc
Thanks in advance
G