S
shagbite
rcd for swa not strictly needed, but it won't harm.
it's my own house..................
edit missus house she would kill me if she heard me calling it mine!
main incommer from meter goes to isolator then into henley block on distrubution board then split from henley to cu's on the board,the new supply to top flat will come from this henley to rcd on board then swa tails into ceiling metal box then on to top flat cu.
does this make better sense ?
20 quid for rcd doesn't seem to much effort.

What's the overcurrent protection for the new SWA submain?
Solid conductors should NOT be crimped. Fact.
Should not or Must not?Solid conductors should NOT be crimped. Fact.

this is far far from fact
Solid conductors should NOT be crimped. Fact.
Fact is I'm very lost with this thread. Gone from suspended ceiling to plaster ceiling with trap. Gone from 80 a 30ma to 100ma .Gone from his house to his misses house. Gone from rcd to switch fuse isolator. Can some one pm me when he finished and tell me what he does. Lol :lol: