I agree that aesthetically it needs one on the ceiling before it drops down to the spur, it's all threaded in tight and fixed through the bezer boxes. Flanged couplers were used and the lead washer compressed. I did try and move it when installed and everything was solid so didn't put in saddles.
Hey Stonsey I'm actually just having some fun with you, the actual conduit looks very very neat and professional, however to be perfect I recon 5-6 saddles are needed, 3-4 on the ceiling and one either side of the bubble set, JMO, can't comment in a negative way about the actual pipe though, as mentioned very nice, I wish we had a thumbs up smillie.