SparkyChick

~
Broke Internet
Esteemed
Supporter
Hi guys,

So on Friday I got a call from a woman desperate (as in she needs it to complete the sale by 12th April) to get a regularisation cert from LABC for her home which has been extended, without sign off on everything. I agreed to do an EICR for the purpose and made sure I included the caveat that if there was anything needed doing to achieve a satisfactory result it would be charged extra.

Within 15 minutes of starting at 8am on Sunday morning, I'd got a list of C1s relating to the consumer unit including exposed copper on meter tails at meter, loose tails in main isolator, live chocblock on top of consumer unit. Worked 8am until 7pm Sunday, 8am until 6pm yesterday and 11am until 5pm today. Finally just got some C3s after rectifying a ---- load of issues and figuring out what's connected where (issues included a 1.5mm lighting circuit connected as a spur to a ring, new front porch lighting supplied from two different circuits, unlabelled circuits in CU, no proper earth on one ring, 5 sockets supplied as a spur in two locations).

I damaged a cable and spent some time (and lifted floorboards and carpet) trying to find a suitable place to join it. So my bill stands at £720 (does that seem reasonable?) plus materials for 3 hard days of head scratching and graft, including lots of tests to rule out weirdness like cross connected rings.

She's just had the cheek to ask for a discount so she can have someone properly re-lay the carpet which of course was down to my mistake causing damage to the cable and the fact and I quote "you spent quite a bit of time thinking". Errr... hello... WTF do you think we do???? Communicate telepathically with the building fabric and ask it nicely... excuse me Mr. RSJ, would you mind telling me where that cable goes please, and if you could enquire what the installation method is I'd greatly appreciate it. Feels like basically it's being suggested I dragged it out deliberately... she's got to be frigging mad... I enjoyed spending my time sat next to a ---- stained toilet bowl with cat litter trays in the next room stinking ot my nostrils I thought, what the hell, this is a nice change of scenery I'll stay a while longer. Coupled with the fact she's a hoarder, is packing to move and the place is an absolute ---- tip crammed with far too much stuff and what can I say... if I could have done it quicker I would have.

Bloody cheek! ---- install, loads issues and not a hope in hell of it ever passing without spending big bucks, 3 days of hard graft (and I still have to write up the notes/observations) and she wants a frigging discount!

What would you do?

For starters, I'm going to provide a far more detailed labour breakdown illustrating what she could have been charged if I was billing by the hour.

Rant over, just needed to get that off my chest to you guys who will appreciate where I'm coming from.
 
I personally would have done the EICR and quoted separate for remedial works it is not your problem she is desperate. If you have resolved the urgent issues then £750 seems nothing if it sells her property. If she is wanting a discount hold back on the Report.
 
Why didnt you just do an eicr and then get paid for that while leaving a price to do all c1-c2.. did the customer want c3s doing if shes selling id presume not.? It sounds abit on the high side to me...
 
Can't really comment on your pricing but if you're convinced you're offering good value then breaking the invoice down into parts and demonstrating that whilst the bill may seem high you're hourly rate is reasonable or lower than usual may go some way.
The trick to these kinda situations is business acumen and how you deal with people, you need to convince her you're already doing her a favour because she's you all time favourite customer. If the Mrs Nice Chick approach fails couldn't you withhold certificates until she coughs up?
 
I agreed to do an EICR for the purpose and made sure I included the caveat that if there was anything needed doing to achieve a satisfactory result it would be charged extra.

I believe there is the reason why things may have not turned out as you may have deserved
Keep reports and remedials as two very separate agreements

Do the Eicr and agree the price,you then could have mentioned that the report is a description only of the existing installation, anything flagged up would be priced for if she required your continued service

You could then also have indicated that if you were to carry out the remedial work a follow up inspection for her could be saved by having the original report adapted to take account of the work you carried out afterwards

Once you dangle the words satisfactory to this sort of customer beforehand you have ceded control to the other party
 
I've not done any of the C3s, just resolved all the C1s, C2s and FIs.

I started off with the intention of just doing the report, but when I saw how bad it was I told her it wouldn't pass (didn't even need to open the board) and she basically said make it pass. Issue was put one problem to bed, test and found more.

Got all the issues around the CU ironed out on Sunday (had to have Western Power out), but sorted the exposed tails at meter, lack of any bonding, exposed basic insulation on about 50% of circuits which meant extending them which was a task itself trying to get them out from behind the meter board, loose tails, live chocblock, broken earths inside the board (arcing on neutral causing some thermal damage to cables), inadequate extension of earths for shower and cooker circuit.

Started testing on Monday morning and found numerous issues when I was identifying what was supplied from where, including all the multiple socket spurs. Got all of the quirks ironed out yesterday and spent today testing.

Wouldn't mind so much if she'd given me the keys and left me to it, but it's been like being supervised. Every half hour or so, "how's it going?" and now I feel guilty for having a couple of 15 minute breaks every day... who'd have thought it eh? Grafters taking a break, forget the fact I've been running round her house like a mad woman! As for trying to convince her I've done her a favour, in my opinion it's a small price to pay for actually being able to complete the sale of her property. She blamed her ex-hubby for the state of things because he oversaw the building of the extension. Well, you've had 10 years to get it signed off, leaving it to the last week is a little lax if you ask me!

The leverage she has on the discount is the carpet and the time I spent trying to find the cable to repair it. That was my bad, caught it with pliers trying to open a bit of trunking (and yes, trunking is easy to open, but not when it's boxed in by other trunking, which is itself boxed in by yet more trunking). Next thing will be the bits of mess I've left dotted around and the piece of coving I cut out to aid running the bonding... all on their instruction!

Oh well, you live and learn. I think the advice about just do the report and then quote for the rest is possibly the best take away from this.

Thanks for the advice fella's and for listening, much appreciated :)
 
If you have a mind to just move on , perhaps offer a couple of hours discount for immediate payment ?
 
£720?! So I'll be able to sell my house?!
And I thought you were doing it out the goodness of your heart. How dare you!

Some customers don't seem to understand the work that goes into some jobs (made 10x harder working around stuff)

Seems like a fair price to me personally, the work that's gone into making it how do you say? Not a f*£king death trap? Lol
 
You know what, the damaged cable and the time spent trying to find that in the floor void, I can give her that because that was my mistake. But what really pi$$ed me off when I spoke to her last night was the implication that I'd dragged it out, by how dare I???? THINKING!!!

I'm sure we've all done it, going round and round on a real head scratcher and there comes a point when you just need to stop, take a step back... have a coffee, a smoke, write an email, get some air, do anything but what you're working on for 10 minutes.

Anyway, today is a different day, finish off the report and move on, lesson learned in terms of how to handle this kind of thing from a business perspective.

Thanks guys :)
 
Hi guys,

So on Friday I got a call from a woman desperate (as in she needs it to complete the sale by 12th April) to get a regularisation cert from LABC for her home which has been extended, without sign off on everything. I agreed to do an EICR for the purpose and made sure I included the caveat that if there was anything needed doing to achieve a satisfactory result it would be charged extra.

Within 15 minutes of starting at 8am on Sunday morning, I'd got a list of C1s relating to the consumer unit including exposed copper on meter tails at meter, loose tails in main isolator, live chocblock on top of consumer unit. Worked 8am until 7pm Sunday, 8am until 6pm yesterday and 11am until 5pm today. Finally just got some C3s after rectifying a **** load of issues and figuring out what's connected where (issues included a 1.5mm lighting circuit connected as a spur to a ring, new front porch lighting supplied from two different circuits, unlabelled circuits in CU, no proper earth on one ring, 5 sockets supplied as a spur in two locations).

I damaged a cable and spent some time (and lifted floorboards and carpet) trying to find a suitable place to join it. So my bill stands at £720 (does that seem reasonable?) plus materials for 3 hard days of head scratching and graft, including lots of tests to rule out weirdness like cross connected rings.

She's just had the cheek to ask for a discount so she can have someone properly re-lay the carpet which of course was down to my mistake causing damage to the cable and the fact and I quote "you spent quite a bit of time thinking". Errr... hello... WTF do you think we do???? Communicate telepathically with the building fabric and ask it nicely... excuse me Mr. RSJ, would you mind telling me where that cable goes please, and if you could enquire what the installation method is I'd greatly appreciate it. Feels like basically it's being suggested I dragged it out deliberately... she's got to be frigging mad... I enjoyed spending my time sat next to a **** stained toilet bowl with cat litter trays in the next room stinking ot my nostrils I thought, what the hell, this is a nice change of scenery I'll stay a while longer. Coupled with the fact she's a hoarder, is packing to move and the place is an absolute **** tip crammed with far too much stuff and what can I say... if I could have done it quicker I would have.

Bloody cheek! **** install, loads issues and not a hope in hell of it ever passing without spending big bucks, 3 days of hard graft (and I still have to write up the notes/observations) and she wants a frigging discount!

What would you do?

For starters, I'm going to provide a far more detailed labour breakdown illustrating what she could have been charged if I was billing by the hour.

Rant over, just needed to get that off my chest to you guys who will appreciate where I'm coming from.
If I have my sums right that about £26/hour which includes fuel to get there and any material used, say roughly 3 days work, not a bad price at all in my opinion, apart from the cable you fortunately damaged, and that happens to the best of us, an occupational hazard, and she wants to ask for a discount for relaying the carpet, she is a hoarder so in my experience not that tidy, I think £720 is a fair pric, when you hear of some sparkies charging £700 for a CU swap.
 
Materials aren't in that total and to be fair, the materials bill isn't that big. Lots of small stuff, probably the most expensive single item will be the 8m of 10mm earth cable for bonding the water.
 
Materials aren't in that total and to be fair, the materials bill isn't that big. Lots of small stuff, probably the most expensive single item will be the 8m of 10mm earth cable for bonding the water.
OK but you still have to replace what you have used, albeit a small cost, that's still not a bad price, people see you haven't supplied much so they think you are expensive not considering the training, knowledge, at least you have the satisfaction of knowing you have done a good job for a fair price, that's my 4 pennyworth.
 
Did you give the customer ANY indication of the cost of the "extras" before you started fixing things? or an update at the end of each day?

In such situations I've already given the customer a price for the EICR and at the end of the first day I would indicate a rough "extras" price and at the end of day 2 I would do the same.... this approach tends to avoid confrontation when the invoice is submitted!
 
We agreed at the start for a day of my time. When the first round of issues were found, I gave her a rough idea of cost and the fact it would need an additional day to actually do the testing.

Then on Monday, when more issues were found she got another update. My only failing there was not conveying that in writing.
 

OFFICIAL SPONSORS

Back
Top