malcolmsanford
I'm with Ezze on this, how is what HS done wrong?
Where there was I assume an existing switch the new work entailed it being made redundant so HS whacked it onto a chocy block and fitted a face plate ....................nowt wrong there.
Ok in the perfect world of sparking, we would be taking the cable out, rerouting cables etc etc, but time is brass and if the client was happy to have the chocy block and face plate then no problems.
When it becomes a problem is plasterers, who wanted to skim a wall, and decides to open up the plate and whack a load of wet muck into a live box and low and behold .....RCD trip. I have never yet met a plasterer that as over come their natural handicap of trying to think and say to himself, the lady said it was dead, and she would know after all tally ho chaps ................
Should we be now getting off HS back lads, or I may have got this all wrong
Where there was I assume an existing switch the new work entailed it being made redundant so HS whacked it onto a chocy block and fitted a face plate ....................nowt wrong there.
Ok in the perfect world of sparking, we would be taking the cable out, rerouting cables etc etc, but time is brass and if the client was happy to have the chocy block and face plate then no problems.
When it becomes a problem is plasterers, who wanted to skim a wall, and decides to open up the plate and whack a load of wet muck into a live box and low and behold .....RCD trip. I have never yet met a plasterer that as over come their natural handicap of trying to think and say to himself, the lady said it was dead, and she would know after all tally ho chaps ................
Should we be now getting off HS back lads, or I may have got this all wrong