We are in the process of tendering for a 100kW PV system, there are a few installation options and one of which is potentially a BB Tap-Off.
They have a 400A EATON busbar system (images attached) that runs from the ground floor up to the top floor (4 floors), our inverter(s) is to be installed at roof level.
Any help would be appreciated
They have a 400A EATON busbar system (images attached) that runs from the ground floor up to the top floor (4 floors), our inverter(s) is to be installed at roof level.
- I am struggling to find the correct parts, has anyone installed or worked with this kit?
- Having a Google of the part numbers, I have found a close match with Vertiv, but the part numbers differ slightly.
- Vertiv tap-offs only seems to go up to 100A