I've got a client that runs an establishment for 364 days of the year, from 9am to midnight - so the only time an EICR would be possible would be between midnight an 8.30am

There are no records, about 8 CU's , few are labelled

I declined the work!
That sounds like a good shout to be fair not many people would be up for that I know I wouldn’t
 
If and when the proposed register of people allowed to do eicr's comes in to force I might intentionally not bother applying to go on it, it will come at a hefty fee in anycase and cant be doing with that. can politely decline them all then.
 
Any such register is pointless unless the “Organising body” has the remit to inspect poor work and follow up to n complaints .....

The schemes don’t do this, so I can’t see such a register as progress
 
Very sensible approach. Out of curiosity, how do you find the standard of their in-house electrical work?

I don’t want to say too much in case one of them was to see this.
But I would say that I think the situation I described above is pretty likely to occur.
 
I've got a client that runs an establishment for 364 days of the year, from 9am to midnight - so the only time an EICR would be possible would be between midnight an 8.30am

There are no records, about 8 CU's , few are labelled

I declined the work!

Those working hours wouldn’t bother me at all, in fact I quite enjoy overnight work.

I just don’t like doing EICRs
 
Speaking of regs numbers any idea of the reg in the blue book pertaining to cable sizing in a SELV circuit I can’t seem to find it
Hi - there's elv lighting info in section 715 and 715.524 is called cross sectional area of conductors. (Still studying up for the test :( )
 
I've got a client that runs an establishment for 364 days of the year, from 9am to midnight - so the only time an EICR would be possible would be between midnight an 8.30am

There are no records, about 8 CU's , few are labelled

I declined the work!

Why? I don’t see the logic.
 
Why? I don’t see the logic.

Do you mean why did I decline the work?

1. I don't like working during the night
2. The lack of previous information and labelling
3. I've seen the site ......... its a right "electrical" mess.
4. Too much for 1 person
 
Hi - there's elv lighting info in section 715 and 715.524 is called cross sectional area of conductors. (Still studying up for the test :( )
The 1.5 mm minimum CSA for the conductors for ELV lighting has been dropped in the 18th edition.
The minimum CSA is now chosen by the load current
Thr 4mm CSA for luminaries suspended from conductors still remains
 
I learned to withhold any information about the EICR until I have been paid for it. One customer asked me to call them when I was finished. There were a number of issues and they asked me to explain them.

Once I had they said they would get someone else to do the work, so I said OK, can you please arrange payment for the report.

"Oh, I'm not paying you anything you haven't done any work after all.
 
I learned to withhold any information about the EICR until I have been paid for it. One customer asked me to call them when I was finished. There were a number of issues and they asked me to explain them.

Once I had they said they would get someone else to do the work, so I said OK, can you please arrange payment for the report.

"Oh, I'm not paying you anything you haven't done any work after all.
Did you not inform them in writing how much the EICR would cost without any remedial work, if required?
 
I must be in the minority as I quite like an EICR now and then, easier than a lot of work we do IMO and they can be interesting.
But also in most cases I agree with the customer to do a 'pre inspection',then any necessary remedials subject to their agreement and finally a nice 'Satisfactory' EICR, seems to work very well generally.
 