Do you ever get the feeling you are banging your head against a concrete wall?No. For an EICR, where you've already measured Zs, don't attempt to calculate R1+R2, there's no point. (It just implies that you've measured something which you haven't.)
Do you ever get the feeling you are banging your head against a concrete wall?No. For an EICR, where you've already measured Zs, don't attempt to calculate R1+R2, there's no point. (It just implies that you've measured something which you haven't.)

Thanks for that@leep82 Take a look here, a great tick sheet guide by one of our members, It is a very useful guide and explains in simple terms what to tick and why.
http://www.electriciansforums.co.uk/posts/955821/


At the minute I am sub contracting to a local company and tomorrow have to go and carry out an EICR on a pub.

[QUOTE="leep82, post: 1251733, member: 47984"of which we only ended up having to do 20% of final circuits,
[/QUOTE]?[/QUOTE]Does this company you are doing the work for have 3 letters for the first part of the name?![]()
?[/QUOTE]Does this company you are doing the work for have 3 letters for the first part of the name?![]()
I was getting at what you meant by the company having three letters at the start of there nameoops I messed up the quotes, there was supposed to be 2 of them!