I don’t know if you’re being sarcastic or not.Too much health and safety that's why nothing gets done in this country.

I don’t know if you’re being sarcastic or not.Too much health and safety that's why nothing gets done in this country.

I don’t know if you’re being sarcastic or not.
![]()
A good part of that is true. I work with someone who worries far too much about health and safety to the point it compromises what he is doing, I am forever saying don't worry about it and truly he doesn't have to.I don’t know if you’re being sarcastic or not.
![]()
I'm getting confused by the OP's comments and trying to understand what planned maintainance and what reactive maintainance he is actually doing as the planned maintainance seems to be lacking when it allows equipment to get to the point of being dangerous when reactive maintainance is carried out
Surely any planned maintainance will have an audit trail and will highlight where work is needed to correct developing problems, the person managing the planned maintainance should then be scheduling the necessary work needed to repair any issues found, if the work isn't scheduled then the manager has to have a good reason why it wasn't
As I questioned in my previous post regarding planned and reactive maintainance something seems to be lacking in that faults or developing issues are not reported correctly or the necessary repairs are not actioned or carried out correctly and a further report made as to the completion or further work required to resolve the issue at the point it becomes a major issue requiring the equipment to be shut down then something has failed within the planned maintainance process to cause this and the audit trail should indicate where the blame liesSo the best thing to do is if In doubt lock it off. I guess you’re right about the peer pressure but ultimately we are liable so unless we can sort it then lock it off. But how does this work when someone carries out an EICR they have to test and if they find something C2 they can only report. They are not liable once they have told the duty holder even if they was the last person touching that circuit. Sorry I am a big overthinker, think I need to get some experience doing EICRs.
There is very limited guidance on this I’ve have a look through company policies and a lot of our guidance covers basics like maintaining isolations ect.What is your employers view.
I agree, I’ve only ever been in a maintenance role at my company but not sure what other industrial setting are like? A lot of the problem is for years equipment was just ran till it failed no proper testing was ever done. If equipment failed they would just replace. This is where I struggle as just as I joined the company they were getting hotter on testing. So I still see it alot of the older lads don’t bother with it so would not notice the same things I do (such as lack of earthing and bad ZS). Hence why I decided to reach out on here as It’s not me to turn a blind eye to things but then again I can’t fix the world.As I questioned in my previous post regarding planned and reactive maintainance something seems to be lacking in that faults or developing issues are not reported correctly or the necessary repairs are not actioned or carried out correctly and a further report made as to the completion or further work required to resolve the issue at the point it becomes a major issue requiring the equipment to be shut down then something has failed within the planned maintainance process to cause this and the audit trail should indicate where the blame lies

What about the company H&S policy as some of what you are saying falls within scope of this and the EAWRThere is very limited guidance on this I’ve have a look through company policies and a lot of our guidance covers basics like maintaining isolations ect.
It is not clear from what you have posted how big the company is but there seems to be something lacking in the maintainance process within it, have you asked your foreman / chargehand / maintainance manager for their thoughts / comments on the maintainance process within the companyI agree, I’ve only ever been in a maintenance role at my company but not sure what other industrial setting are like? A lot of the problem is for years equipment was just ran till it failed no proper testing was ever done. If equipment failed they would just replace. This is where I struggle as just as I joined the company they were getting hotter on testing. So I still see it alot of the older lads don’t bother with it so would not notice the same things I do (such as lack of earthing and bad ZS). Hence why I decided to reach out on here as It’s not me to turn a blind eye to things but then again I can’t fix the world.
But yeah I think this is where it all stems from lack of testing which now I’m in the position where I’m finding bits that should have been picked up years ago so when I state the problems I get (oh no you can switch that off) or something to that effect.
Thank you I shall have a look into the policies as there must be something. So if it’s a C2 it’s advisable to lock off I’m just thinking of the guys that carry out EIC that record it and as stated by lister discharge there Duty of care to the duty holder?What about the company H&S policy as some of what you are saying falls within scope of this and the EAWR
It is not clear from what you have posted how big the company is but there seems to be something lacking in the maintainance process within it, have you asked your foreman / chargehand / maintainance manager for their thoughts / comments on the maintainance process within the company
A good planned maintainance system should minimise how much reactive maintainance needed the fact you mention coding some issues a C2 would infer that the issues are within the fixed wiring system if machinery is involved then for me it is more like ISITEE which if something warrants the C2 you suggest then really you are looking towards locking it off and placing a do not use on it until the necessary repairs are carried out
I think if it was me I would be taking a picture of any maintainance dockets before handing them to your foreman / chargehand so you have your own paper trail just in case an incident occurs and some documentation is convienently "lost" that then puts you in the frame
While it can muddy the waters for tht competent and knowledge,it does serve as a good basis for explaining to the layman levels of danger; C1 - Immediately Dangerous; I can see it, I can touch it, it will kill me now, C2 - Potentially dangerous; something has to go wrong for it to kill me and C3; not great but won't kill you - Red, Amber , Green - The RAG system by another approach, thr fact it integrates C1 C2 C3 as we know it I think is a byproduct, I for certainly use the same approach with clients as they're already seeing it in thier EICR paperwork.You need to stop thinking along the lines of Codes this has nothing to do with an EICR.


I hate these "Actions" that management implement just to be seen to be doing something.Thank you guys for all your help!
There is very limited guidance on this I’ve have a look through company policies and a lot of our guidance covers basics like maintaining isolations ect.
I agree, I’ve only ever been in a maintenance role at my company but not sure what other industrial setting are like? A lot of the problem is for years equipment was just ran till it failed no proper testing was ever done. If equipment failed they would just replace. This is where I struggle as just as I joined the company they were getting hotter on testing. So I still see it alot of the older lads don’t bother with it so would not notice the same things I do (such as lack of earthing and bad ZS). Hence why I decided to reach out on here as It’s not me to turn a blind eye to things but then again I can’t fix the world.
But yeah I think this is where it all stems from lack of testing which now I’m in the position where I’m finding bits that should have been picked up years ago so when I state the problems I get (oh no you can switch that off) or something to that effect.