Tel, Spin - yes, fair comment! Get so used to the same routine it's easy to forget. But, an interesting technical point, when does 'extending a circuit' (non notifiable) start to cross over with fundamentally changing the characteristics of a circuit so far as Zs and different CPD's is concerned?

AND - no one has yet to mention the letters R, C & D.
 
Pretty grey area on the online notification, I was told to but extra sockets (not in special location) as "Other".....when you notify "Other" in comes as Notifiable to LA, I'm going to question it this week.
 
wobbly, if you post your location, i'm sure one of us is close to you.
 
Tel, Spin - yes, fair comment! Get so used to the same routine it's easy to forget. But, an interesting technical point, when does 'extending a circuit' (non notifiable) start to cross over with fundamentally changing the characteristics of a circuit so far as Zs and different CPD's is concerned?

AND - no one has yet to mention the letters R, C & D.

AND - no one has mentioned the letters b, o, n, d, i, n & g!
 
To be honest Rock, I am starting to think, that Part P, should just be totally ignored.
I had someone tell me the other day, that you must have the 2391 to be able to issue an EIC or MEIWC, or be a member of a competent persons scheme.
Apparently this bit in Part P says so:
[TD="bgcolor: transparent"] 1.10 “Qualified” in this context means having the appropriate qualifications, knowledge and experience to carry out the inspection and testing procedures and complete the relevant electrical installation certificate. [/TD]

 
Adding additional sockets, is not notifiable under in part P unless in a special location, and in England and Wales only. Also NAPIT doesn't state otherwise.

BS 7671 however requires RCD protection, where ordinary persons in houses etc. are concerned; this could be accomplished by fitting a combined RCD --- fused spur unit at the origin of the existing spur, so that the existing socket and the new are fully protected.


Regards
 
Tel, Spin - yes, fair comment! Get so used to the same routine it's easy to forget. But, an interesting technical point, when does 'extending a circuit' (non notifiable) start to cross over with fundamentally changing the characteristics of a circuit so far as Zs and different CPD's is concerned?

AND - no one has yet to mention the letters R, C & D.


Cant for the life of me figure why this isnt notifiable?, as above Characteristics of circuit altered, how does a DIY guy with no tester Know if the CPC is continuous in the new cable he has added, if the zs is already on the limit, how does he not know if it is now over the required value?, how does he know if the house is earthed correctly at all?....farce
 
If its entered under "Other Work" as I was advised(incorrectly?) to do (for the last 3 years) then it appears as......Notifiable but i will them ring tomorrow
 
If its entered under "Other Work" as I was advised(incorrectly?) to do (for the last 3 years) then it appears as......Notifiable but i will them ring tomorrow

Of course they'll say it's notifiable- they want the money!!
 
I will be putting in an invoice to Napit for all them £1 notifications I didn't need to do!
 
who is going to check zs, volt drop, continuity,polarity,insulation resistance,rcd protection present and tested and bonding?
an electrician should do these tests without thinking about it, anyone could add extra sockets and yes they should work if done corectly the problem is always if a fault occured later on you see dead people.
i think but not sure its a minnor works cert but not notifiable unless in special location.
this does not mean anyone can do this work, they should still be competant and do tests listed on minnor works it's up to diyer to prove competancy later on if someone dies.
I would also ask if anyone knows of any household insurers that have not paid out because of diyers?
 

OFFICIAL SPONSORS

Back
Top