Discuss Filling in this part EICR in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

cliffed

-
Arms
Supporter
Reaction score
644
The bit in red does this apply to the DB that supplies the DB…or the actual DB not connected to the origin…just had a senior moment
 

Attachments

  • 4F88AB07-97E4-40ED-BC91-4A1603DC2F0D.jpeg
    228.7 KB · Views: 1
Cant open it, but if it’s the bit I think, it’s the schedule of test results and you are listing circuits and results for a given DB. If that DB is not directly connected to the cutout then fill out the bit in the box above saying what is feeding it and the other bits about the circuit supplying it and the protective device of the supply circuit.
 
Cant open it, but if it’s the bit I think, it’s the schedule of test results and you are listing circuits and results for a given DB. If that DB is not directly connected to the cutout then fill out the bit in the box above saying what is feeding it and the other bits about the circuit supplying it and the protective device of the supply circuit.
Cheers definitely the supply curcuit, pic still not opening.
A bit puzzling the DB that it supplies, there’s then no where to put the Zs of that DB,if required
 

Attachments

  • FBE30ED2-ED83-4826-902A-E4E66571987F.jpeg
    228.7 KB · Views: 1
Cheers definitely the supply curcuit, pic still not opening.
A bit puzzling the DB that it supplies, there’s then no where to put the Zs of that DB,if required
I suspect that there actually is.
I don't know if it helps but here's another couple of format forms that might clarify the one you are looking at.
This is the Napit version... the section on the left is for what's supplying it, as we discussed. The section on the right is for "this end" of it; I think Zd should actually say Zdb (as Zd means fault current of first fault in an IT earthing system) and Ipf should have the associated prospective fault current for the distribution circuit. I'm not overly impressed with this bit on the form, it's not laid out clearly at all!

1638298641313.png

Here's the Electraform version which is the easiest to understand of all of them in my opinion. I miss using this!

1638299482280.png

I can't tell which form you have (?NICEIC) but I suspect it is in two parts like these two above.
 
Last edited:
I suspect that there actually is.
I don't know if it helps but here's another couple of format forms that might clarify the one you are looking at.
This is the Napit version... the section on the left is for what's supplying it, as we discussed. The section on the right is for "this end" of it; I think Zd should actually say Zdb (as Zd means fault current of first fault in an IT earthing system) and Ipf should have the associated prospective fault current for the distribution circuit. I'm not overly impressed with this bit on the form, it's not laid out clearly at all!

View attachment 92547

Here's the Electraform version which is the easiest to understand of all of them in my opinion. I miss using this!

View attachment 92549

I can't tell which form you have (?NICEIC) but I suspect it is in two parts like these two above.
Cheers that helps
 

Reply to Filling in this part EICR in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

Similar Threads

Hello, Looking for some advice following a botched 3 phase upgrade today. Some background: Commercial unit originally fitted out (4 years ago)...
Replies
7
Views
501
Had an enquiry where the installation (commercial) is relatively new and client has requested a condition report. Probably 80-100 circuits plus...
Replies
8
Views
994
Hi I am carrying out an EICR. I have a garage mini sub DB supplied via 2 x 2.5mm T&E equivalent 5.0mm protected at main DB by a 32A mcb. I know...
Replies
8
Views
1K
Hope you're all well . I've had ring door bell 2nd generation hardwired for 1.5 yrs... it was connected to transformer which is connected to the...
Replies
22
Views
1K
Hi guys Completed an EICR yesterday. One of the Sockets Radials had no CPC so R1+R2 plus Zs could not be not be completed. Does anyone know the...
Replies
14
Views
526

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
This website was designed, optimised and is hosted by Untold Media. Operating under the name Untold Media since 2001.
Back
Top
AdBlock Detected

We get it, advertisements are annoying!

Sure, ad-blocking software does a great job at blocking ads, but it also blocks useful features of our website. For the best site experience please disable your AdBlocker.

I've Disabled AdBlock