A
ample current
Was in a house the other day and was told that the gas board installed a new pipe (due to the old one leaking) and a new meter to a different position round the side of the house, (old entry point was to the rear). the house has a PME supply and the old pipe was bonded correctly to the MET, However the new meter was some distance from the old entry point and they connected the pipe in the meterbox to an earth rod about 2m away. the pipe then runs around the outside of the house all the way to the entry point at the rear of the house where it goes through the wall and to the boiler in the kitchen.
Is this acceptable?
I was thinking about connecting the old bonding cable to the new gas pipe as it enters the house and leaving the earth rod as the gas board have left it connected to the earth rod.
Is this acceptable?
I was thinking about connecting the old bonding cable to the new gas pipe as it enters the house and leaving the earth rod as the gas board have left it connected to the earth rod.