There are couple of engineers that I rate on the committee
That's a good starting point
and there are a number of difficult things to balance.
Most people (and I was one of them until a few years ago) who don't realise the extra constraints many churches operate under - and how "complicated" church finance is.
I have to admit heating that place is a difficult challenge.
This is a large 19th century stone building (Gd 1 listed), with abysmal insulation meaning any conventional means needs to be on a long time in advance to actually do anything, which is expensive.
Any retro-fitting of conventional means needs to get through listed building consent AND the church of England faculty process. Advice from both parties is apparently that it isn't likely to be granted.
The real mistake was physically removing the old radiators (see below) as now they are gone, permission to reinstate them is likely to be difficult to get. Replacing them would have been a different story.
Ah yes, the "I wouldn't start from here" problem. We are only G2 listed, and in part that was done to stop the highways people knocking it down for a bypass.
-an oil tank outside and an abandoned oil-fired boiler that once ran large radiators (now unfortunately removed)
-the existing under-pew heating
So it would be something of a miracle if this is the last attempt at heating that ever happens.
(The best system I've seen in a similar space is a rarity in the UK, gas fired blown air. You get the instant-on heat and heating from the bottom up with minimal aesthetic change. Decent heat and reasonable bills.)
We too have the "poor insulation" - not least we have much larger than usual windows, all single glazed, and many of them long overdue for some TLC (lets just say, we don't have a problem with lack of ventilation !) We do have the luxury of a boring flat ceiling which I believe does have "some" insulation above it.
Our heating was the old large bore cast pipes and oil fired boiler. The boiler was apparently 2nd hand in the early 70s when electricity arrived - before that it was coal/coke fired and someone had to light and stoke it the day before each service. Before I was involved, they had some fan coils fitted which are very effective at heating the place up quickly - the limitation is the heat output from the oil boiler and that it takes about 1/2 hour just to get the 100gallons (as an estimate) of water in the system up to the point where the thermal switches turn on the fans. While this did mean we could get from cold to comfortable in an hour or so, they had major problems :
1) There were too noisy so got switched off at the beginning of the service
2) At this point, the water in the system wasn't hot enough for the old pipes to take over and keep the place warm.
Between these, it meant that it all went cold early in the service and was recovering nicely by the time we finished.
By experimentation, we've arrived at a working setup. I added a resistor to each unit to give an extra low fan speed. Most of the time, they are so quiet people forget they are still running. I added a run-on timer to the circulation pump to keep water going round (and hence through the fan coils) when the room stat turns off. I also changed the thermal switches for a higher temperature, so the pipes are hotter before the fan kick in. Between them, this gets the place comfortable fairly quickly (in practice, we find we only use the extra-low speed and it's enough to do the initial heat up) and it stays comfortable during the service. I can hear (by the pops in the sound system) the room stat cycling the boiler on and off.
I would suggest that as you previously had radiators, it may be worth revisiting options there. I realise there will be some who would be against it, but if done right I'm sure they could be a lot less visible than a load of overhead grill elements. That would be something to raise - if they won't allow reinstatement of radiators, how on earth are you going to get permissions for all those radiant heaters ?
Something else I'd like to experiment with is adding one or two fans to circulate warm (or less cold ?) air down from up high. Access is a problem as the ceiling is about 6m (20ft) high, and the only access to the roof space is via a small loft hatch - I ain't going up there on a ladder

One of the things fan heaters do is de-stratify the air - though a lot less so when on the extra low speed.
There is very little useful detail in the proposal
Ah yes, seen that ourselves.
A few years ago we had someone in - I vaguely recall they were recommended as specialists. To be fair, their proposals were reasonably detailed, but impractical (and very unaffordable). One of them was the head grills you've had suggested - and I vetoed that in short order. Another was a new boiler - that would have had to be dismantled to get it through the door into the boiler room.
One of the then churchwardens insisted on getting a quote from the people that fitted heat pumps to his rambling big pile. I did a quick calculation and figured it wouldn't be able to heat the place in cold weather - from memory, it's limit would be something like 8˚C above external temperature. At least our supply would have run it - just. Pity the supplier hadn't done any sensible calcs of their own.
Said person was known for being thrifty, and during Zoom meetings had during covid was noted to appear in a thick coat. His wife also complained about being permanently cold - and was very happy when they downsized to somewhere warmer.
On the plus side if this goes ahead I get to modify some MICC which will cheer me up for a week or two.
Other than when I was an apprentice <cough> years ago, I've never had the opportunity. I always feel like I've missed out.
I feel some of the needed improvements in our place would suit pyro - but of course I don't have the tools anyway

There is some in the boiler room, but it's a right mangled mess from when it was moved during a roof replacement and roughly clipped back in place afterwards.
At one or two of the other churches we go to, I find myself getting told off by SWMBO when I'm sat there admiring the pyro work.