O

ohvohv

Hi all I've recently fitted a underfloor heating system using heatmiser controls and a Worcester Bosch oil system boiler but I'm a bit unsure as to what connection to make to the boiler. On the heatmiser wiring center I have an in and out boiler enable volt free, and at the boiler I have L N E but a bit uncertain what goes where. Please see attached photos. Any help appreciated.

Thanks james

View attachment 35775

View attachment 35776

View attachment 35777

View attachment 35778
 
In my experience Boilers normally require LNE and an additional switched live - call for heat - to say "fire up and supply heat" - this normally comes from whatever control arrangement you have.The permanent live is to allow for things like pump over-run after call for heat has ended.

In your case the boiler (old??) doesn't seem to have this so the call for heat is just the switched live - boiler out - described in your worcester pic. You may need to put a link between live and boiler in on the heatmiser control panel.

This does seem a little inflexible...

Whiles we're on the subject the Heatmiser UH1 is a totally crap piece of design...
 
In my experience Boilers normally require LNE and an additional switched live - call for heat - to say "fire up and supply heat" - this normally comes from whatever control arrangement you have.The permanent live is to allow for things like pump over-run after call for heat has ended.

In your case the boiler (old??) doesn't seem to have this so the call for heat is just the switched live - boiler out - described in your worcester pic. You may need to put a link between live and boiler in on the heatmiser control panel.

This does seem a little inflexible...

Whiles we're on the subject the Heatmiser UH1 is a totally crap piece of design...
Hi mate no the boiler in Worcesters latest model oil system boiler. I would agreed about the heatmiser I don't think I'll be using it again
 
In my experience Boilers normally require LNE and an additional switched live - call for heat - to say "fire up and supply heat" - this normally comes from whatever control arrangement you have.The permanent live is to allow for things like pump over-run after call for heat has ended.

In your case the boiler (old??) doesn't seem to have this so the call for heat is just the switched live - boiler out - described in your worcester pic. You may need to put a link between live and boiler in on the heatmiser control panel.

This does seem a little inflexible...

Whiles we're on the subject the Heatmiser UH1 is a totally crap piece of design...
Hi mate no the boiler in Worcesters latest model oil system boiler. I would agreed about the heatmiser I don't think I'll be using it again
Heatmiser is brilliant gear if you know what your doing.
I'm a heating engineer but I've not used heatmiser before so I little uncertain.
 

OFFICIAL SPONSORS

Back
Top