Hi fellas
Im just starting out on my own and ive been asked to quote first commercial job. Ive worked on all sorts from domestic to industrial but this is the first non domestic job that ive had to quote.
Basically need to supply a 16mm swa to 10 way 17th cu. then supplying 10 twin skts all in 20mm plastic. move a load of recess lighting in a suspended ceiling and wire 2 bulkheads with 8 spots on each, an illumanated menu and 2 outside signs. 3 aircon units in suspended ceiling need wiring. and main gas bonding. all additional lighting going to an 8 gang grid switch. the swa run is 28 mtrs.also have 6 cctv cameras to wire in plastic tube. its basically a bank transformed into a fast food restaurant. emergency lighting and fire alarms are already in.
Ive quoted 8.5 days on my own plus materials.do you think £2300 is reallistic.
cheers guys
 
The are a lot of companies, and people who will rip you off out there. So before anything you need to preseant a copy of your terms and conditions. If you dont get paid and go to court, then your terms and conditions will become part of the evidence.
You also need to inplement stage payments, 1. first fix cabling 2. second fix 3. final commissioning/handover. I know this sounds over the top, but this is how contracts are best done.
 
I have been self employed for 8 years now. I used to struggle with quoting. Always used to stress about my pricing.

Make sure your quote looks professional for one thing. Pad out the writing in the text to emphasise the work involved. This also serves as a concise list of what you are being paid to carry out. The job sounds like there will be extra little bits here and there by the sound of it. Mention all work will be tested and certified as per BS7671. Finally add on a contingency of say 5-10% for unknowns.

Your quote sounds ok to me, maybe a touch high but TBH it's real hard to say without seeing the job itself.

Good luck man!
 
Have to agree with what tazz says. getting your money in instalments is a must. If you can draw a plan of the restaurant and then you can mark up everything you are doing on it. Get them to sign it. Makes things a lot more clear when they try to change and add things on.

Finally add on a contingency of say 5-10% for unknowns.QUOTE]

As long as you don't put is like this on the quote. It sounds like you can just charge them an extra 5-10% if you feel like it. If you want to do this then hide it in the quote price somehow.
 
Thanks Guys
I always try and get payment after first fix or at least upfront for materials. To be honest I might go in a little bit cheaper as I really would like this job to show for my next Napit assessment .
I'm adding 15% mark up on materials and charging £150 a day I think realistically it will take me about 8 days in total plus it's a 50 mile round trip to site.
I haven't give him a quote yet as I'm trying to get my materials as reasonable as possible.
 