Right, before I get any more sniping I think I need to clear a few things up. I am not another B&Q customer, and quite frankly to just assume so is disrespectful. You don't know the first thing about me, and I never felt the need to give you a back story but maybe now I should. Far from being a DIYer I actually passed my C&G 2330 with distinction in all units last year. I have been actively looking for work within the industry, looking to also add my 2391 and 2356 but several unfortunate personal and financial setbacks have made that extremely difficult for the time being. As I'm sure all you qualified sparks will agree doing it in the classroom is one thing, doing it out there in the real world is quite another - and as someone who lacks some of the practical experience required I came to this forum seeking support and advice.
Micknew, I thought that the fact I've been given a job spec that forbids the removal of flooring or addition of trunking in order to make this a dedicated circuit at the CU might well qualify this as being an unusual problem.
Murdoch, you asked ME why you should sign off MY design hence why I said I would pay you. If you are unable to grasp basic english, maybe you should be posting on the Plumbers Forum :wink_smile:
I have a beligerant uncle who wants this job done as quickly and cheaply as possible, as I'm sure most of your clients would. I know the importance of putting safety first, but he is determined to go ahead regardless and I want to be there to make sure it's done right.
I know I lack experience and have a long way to go, but I know with the right guidance I can do it right. I'll even pay to notify Building control and get it signed off by a qualified spark myself if needs be!
If my proposal is shot, then I can accept that, all I want is to know if I'm on the right tracks, or if I should go back to the drawing board.
Thanks guys, I genuinely do appreciate your input.