A friend as asked me to finish off the wiring, plumbing and gas in his kitchen. He’s had a wall moved, “it’s not load bearing so no need for a beam” says the builder. The bath upstairs is now ¾” lower than the tiles. The builder and electrician have done a runner, taking my mates money with them.


So now he’s asked me to finish off the job,


I hold a gas safe certificate and 17th edition but other than that it’s my 30 year old C&G.


Legally where do I stand!


BTW there was no building regs approval for the wall!

Remember this is a mate that has helped me through some bad times!
 
Last edited by a moderator:
Get a bleedin screwjack in there pronto. this builder clearly doesn't know what he's on about.
 
before you do anything Id get a structual engineer / good builder to check that thers no structual damage ( bath dropping dosent sound good)
 
After that, legally it should be notified, you can pay the labc costs or look at part p if you think it'd be useful in future. Really, though, if they have taken out a loadbearing wall (if the bath is lower, it was a loadbearing wall) you need to get a decent builder in there and put in an RSJ properly, and again if it's worthy of planning - well it needs to go through building control.

But your (or your mate's) main priority needs to be get down HSS hire and get a couple of props to put where the wall was!
 
Last edited by a moderator:
i would get the wall and bath looked at first as bugsy and rocker have said. then i guess its a personal call on the gas and elecs. although if it was a personal friend of mine i know what i would do
 
Last edited by a moderator:
Tell him not to use the bath either until it is properly supported! Get a lump of 4x4 with 3 or 4 acro's under it first thing tomorrow.
 
I didn’t want to get involved with this mess, but he’s my best mate.
How the hell do you tell him it’s his problem and walk away?
 
best thing as the others have said is to get the structure secured and checked out first. and then its your call tbh on the gas and electric. how much work did the electrician do? not sure if any new curcuits have been put in or if you can see them to make a call on them.
 
No one is saying walk away, we all have received and given help to our closest friends.

As above get a support in there quick and don't fill the bath or put any more weight in that area. Get a builder in to look at the structure ASAP. The gas and electrics you can sort out and I'm sure the building control will be interested in the cowboy that's done this.
 
i take it you dont want to drop your mate in it with building control as they will insist that the wall that has gone is replaced exactly as it was , howether i would recomend that that your freind imediately get structural engineer to quote for the job and explain what remedies need to be in place, find another couple of labourers to do the job properly this time.
after structure is done notify lab of elecs and gas if qualified and terll your mate he is lucky these fake builders didnt kill him and family.
 
i meant get structure guy to tell you what needs doing but employ somene else as they charge a fortune.
 
If we ever find the builder again he’ll be on hospital food for a while.
But legally where do I stand.
The original house ring main has been extended I think in to the kitchen. I need to install 2 spurs to an area that has no nearby supply. But it has a redundant 6mm cooker supply near by, can this be used?
 
You can use the 6mm cable for sockets just rate the mcb to lower csa of the circuit and make sure it tests out ok. As for doing any immediate work I think you can (please correct me if I'm wrong lads) part p allows work to be carried out to make safe that you don't have to report before commencing. Putting 2 sockets in a kitchen as a "temporary measure" should class as you need electricity in a kitchen to cook and prepare food. Doing this on a circuit you have put in is safer than the cowboys circuit, produce a minor works cert for lba to see what you've done.
 
I didn’t want to get involved with this mess, but he’s my best mate.
How the hell do you tell him it’s his problem and walk away?

If you're anything like me you don't walk away. You do your best to help the bloke.

The first thing I would do is secure the kitchen ceiling / bathroom floor. If that means getting another builder bloke to put an RSJ in then so be it.

Then - and only then - you decide what you're going to do about the electrics & gas.
 