Hi gents and ladies,
I’ve just bought a Kewtech KT63, the instructions aren’t very clear on lead setup. When doing a Ze is this a 3 lead test on no trip setting, using the green blue and brown test leads? When doing PEFC and PSCC is this a 2 lead test on high setting. So the blue/green leads connected together on the earth or neutral bar and the brown lead on line?
Thanks
I’ve just bought a Kewtech KT63, the instructions aren’t very clear on lead setup. When doing a Ze is this a 3 lead test on no trip setting, using the green blue and brown test leads? When doing PEFC and PSCC is this a 2 lead test on high setting. So the blue/green leads connected together on the earth or neutral bar and the brown lead on line?
Thanks