I have a Sync Energy control box set-up. Just added the CT clamp and connected to socket in control box. However, on trying to enable solar, app says load balancing not set up correctly. I have tested the cable for continuity and all fine. I get a reading of about 300ohms which would be the clamp resistance. Any suggestions on what might be wrong? Thanks, Peter B.